2.1.5 Assembly of Splashplate and Plate Shelf (See Figure 3)
a) Fix as per instructions supplied with kit.
2.2 CONNECTION TO A GAS SUPPLY
The gas supply piping and connection to unit must be installed in accordance with the various regulations listed on
front page of this document. Refer further to Section 1.4 and check gas soundness.
2.3 CONNECTION TO AN ELECTRICAL SUPPLY
The electrical connections must comply with relevant standards listed on the front page of this document. Refer
further to Section 1.5.
2.4 CONNECTION TO A WATER SUPPLY
Not applicable to these appliances.
2.5 PRE-COMMISSIONING CHECK
Ensure lift-off hob with open-top burners (where applicable) or worktop and oven linings are properly located. Check
also that oven grid shelves slide in and out easily. Check all packing material has been removed. It is necessary for
gas pressure to be checked before the unit is commissioned. A suitable pressure gauge must be connected to
pressure test point(s) as follows:
2.5.1 Open Top Burners (where applicable).
Pull gas tap knobs off and remove control panel to access test point. Refer to Section 1.9 for pressure settings. Three
burners should be operating on full flame when setting burner operating pressure.
The open top burner gas pressure is adjusted by means of external governor mounted at rear of unit.
2.5.2 Ovens
FIRST ENSURE ELECTRICITY SUPPLY IS OFF.
Remove oven control panel as detailed in Section 3.2.1 and draw panel forward on its slides. Remove burner grille (4
screws).
Connect pressure gauge to outlet test point immediately below multifunctional gas control.
Note that inlet and outlet points are provided on control also.
a) Light oven as described in accompanying User's Instructions. At this stage, take care not to touch live connections
which are now exposed behind withdrawn oven control panel.