Falcon G1006X O/T Скачать руководство пользователя страница 6

Solid Top 

Check aeration shroud is  located in position shown  in Figure  3A. There should  be no flame lift or  light 
back.    Flames  should  be  blue  although  slight  yellow 
tipping is acceptable for propane operation.  

Injector should be  located  centrally  within burner venturi 
as detailed in Figure 3B. 

 

 

 

 

 

 

By-Pass Rates

 

These are pre-set. To check, proceed as follows:- 

Oven Burner

 

Remove vertical control panel and open lower front panel as detailed in Section 3. Light burner and heat 
oven for 45 minutes at a setting of 275ºC before reducing to 125ºC. 

Check flame lengths are approximately 5mm long.  

Check setting by turning knob to 275ºC and back to 125ºC. The flame should reduce, but not extinguish. 

Open and Solid Top Burners

 

Check flame lengths reduce to approximately 5mm when gas control knob is turned to low flame setting.  
The flame should reduce, but not extinguish.  

 
 
 

 

Содержание G1006X O/T

Страница 1: ...ould be left with the Engineer in Charge for reference during servicing Further to this the Users Instructions should be handed over to the User having had a demonstration of the operation and cleanin...

Страница 2: ...ion systems Gas water and electrical supply external to unit Light bulbs Re installing vacuum in kettle jackets Replacement of grill burner ceramics when damage has been clearly caused by misuse Where...

Страница 3: ...onsulted to determine the necessary clearance to any rear wall or overlying surface Some appliances require greater clearances than others The largest figure quoted in the individual instructions will...

Страница 4: ...The installation MUST BE TESTED FOR GAS SOUNDNESS details are given in IGE UP 1 The adjustable governor supplied must be fitted to natural gas appliances in an accessible and spillage free position an...

Страница 5: ...e panel as described in Section 3 2 4 An adjustable governor is supplied for natural gas appliances Propane appliance pressure is controlled by the incoming supply regulator For multiple burner natura...

Страница 6: ...check proceed as follows Oven Burner Remove vertical control panel and open lower front panel as detailed in Section 3 Light burner and heat oven for 45 minutes at a setting of 275 C before reducing...

Страница 7: ...curing burner components Check that burner caps and spillage trays are correctly positioned before replacing pan supports 6 A pot rack can be supplied as an optional extra 2 2 Connection to a Gas Supp...

Страница 8: ...f appliance approximately 25mm to rear of their final position Both panels are then slid forward into position the RH one to engage its locating pins into the slots in the rear of vertical control pan...

Страница 9: ...njector Remove main injector Replace in reverse order Twin Bullseye Remove bullseyes rings and hob fillings Remove the four screws securing centre support Remove centre divider plate Remove the two sc...

Страница 10: ...ol c Open bottom front panel and disconnect nut which secures thermocouple head to pilot assembly and withdraw d Fit new thermocouple Ensure the head is pushed firmly into position before tightening n...

Страница 11: ...cket to Z bracket d Open oven door and release phial by removing clips which secure it to roof baffle e Gently pull phial and capillary tube through oven side hole and withdraw thermostat f Remove rig...

Страница 12: ...do saddle clamp plate to float rail f Unscrew burner assembly and manifold bracket from side panel and crown plate g Remove burner assembly c w with gas tap and manifold bracket to gain complete acces...

Страница 13: ...uter 537883024 Control knob oven 537060015 Twin bull burner Injector NG centre 537883065 Control knob FFD 531880520 Twin bull burner injector Prop 537883010 Oven FFD valve 537880090 Oven igniter lead...

Отзывы: