![background image](http://html1.mh-extra.com/html/falcon/f18/f18_owners-manual_3253542033.webp)
22.2 – Tack run:
With the line kit will be a 9 foot piece of 3mm bungee. This
bungee will tie to the large nylon ring that is now fed through the spin halyard. Feed
the other end of the line through the rear most center grommet in the trampoline
and then port to the outer ring attached to aft end of the tramp. Once through this
ring feed under the tramp to the starboard hull just forward of the dagger board
trunk and tie a 16mm plain block to the end.
The spin tack line will exit from the spin pole approximately 1 foot forward of the
base on the starboard side of the boat. A tag line should have been provided
leading through the front beam. Tie the end of the spin tack to the tag line and pull
through the forward beam. Once through the beam, the tack line will feed through
the tack release line ring and then to the cam cleat located on the inside back face
of the beam. From there it continues starboard through the flip flop block on the
port outer beam. Feed it then aft through the same ring used to hold the jib sheet
and then through the 16mm block tied to the bungee attached to the spin halyard.
The bitter end will then just tie to one of the trampoline side loops.