19
INSTALLATION
3
Place the hob alongside the cavity in the
worktop and connect the power cable to
the electrical socket.
IMPORTANT
: Carry out connection with the power disconnected. There must be a
good grounding connection and a switch must be provided in an accessible place to
isolate all phases, with at least 1/8 inch clearance between contacts.
The manufacturer will not accept responsibility for installations carried out other than
as directed here.
It is equipped with a power input cable for high temperatures.
If a new power input cable is required, installation should be performed by a technician
certified by the manufacturer.
If the power feed wire is damaged, it must be replaced by the manufacturer, by the
after-sales service or by authorized personnel for safety reasons.
4
Next insert the hob in the worktop cavity,
pressing down firmly to ensure a good seal.
5
NOTE: This equipment complies with standard 82/499/CE on radio interferences.
Fix the 4 clamps underneath the hob to the 4
corners of the cavity.
(Clamps, brackets and nuts are supplied in
accessory bag).