WATER CONNECTIONS
No leaks from the connections or tubes
FUNCTIONING
Boiler and operating pressures are normal.
The pressure gauge is working properly.
The self-leveling device is working properly.
The expansion valves are working properly
6. Installation Check-up
WARNING
$)7(5 ,167$//$7,21 &+(&.72 6(( ,)7+( 0$&+,1( ,6 :25.,1* 3523(5/< VHH WKH
Installation Module C)
GROUPS
+RRNXSWKH¿OWHUKROGHUVWRWKHJURXSVZLWKRXWFRIIHH
Let each group dispense water for about a minute.
HOT WATER
Continuously dispense hot water (pressing the appropriate button) until at least 4 liters of water have been used for a
machine with 1 group, 6 liters for a machine with 2 groups and 9 liters for a machine with 3 groups (see the “Cleaning and
Maintenance” Chapter in the User’s Manual).
STEAM
Dispense steam from the nozzles for about a minute, using the appropriate buttons.
WARNING
: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE ALLOWING THE
:25.(5 72 67$57 86,1* 7+( 0$&+,1( :$6+ 7+( ,17(51$/ &20321(176$&&25',1* 72 7+(
INSTRUCTIONS BELOW:
25
English