Bayt 980
RECOGNITION OF THE RIGHT AND LEFT HANDED BAYT 980
Movement of the barrier
beam when opening
Bayt 980
- internal view
A
Right - RH -
Movement of the barrier
beam when opening
Bayt 980
- internal view
B
External
entrance
page
3
!
Important:
screw down the entire length of the threading of the anchor bolts to the anchor plate before cementing it in its site.
Important:
the anchor plate must be perfectly levelled before it is cemented using a level in both directions. Furthermore, it is
necessary that it be
raised by 5 mm
from the level of the roadway pavement (Fig.3).
304mm
354mm
5mm
~ 500mm
~ 500mm
65mm
Four M14
anchor bolts
8
~ 600mm
Roadway pavement
7
7
6
4
5
3
1
1.
Cabinet door
2.
Bayt 980
housing cabinet
3.
Installed anchor plate
4.
Conduit for the cables for
the installation of a possible
second
Bayt 980 barrier or
for photocells attached to
the fixed pedestal with
yoke.
5.
Base foundation in
concrete
500x500x600 mm
6.
ø50mm conduit for
service cabling
7.
Level both sides
8.
Four M14 anchor bolts
that extend for 65 mm
Internal side of the closure
of the driveway
Left - LH -
FIG. 2
INSTALLATION OF THE ANCHORING PLATE IN THE GROUND
FIG. 3
2
The Bayt 980 traffic control barrier is distinguished in Right Handed or Left Handed versions according to how it is observed
from outside the installation: in any case the opening thrust of the hydraulic piston must always lift the barrier beam (Fig. 2).
The first operation to be carried out is the cementing of the
Anchor Plate
into the ground on a levelled surface obtained through the
pouring of a cement slab, paying attention that the longer side corresponds to the cabinet door side. It is necessary then to arrange
one or two flex conduit tubes with a 50mm diameter, which will enable the later passage of the electrical service cables (Electrical
powering of the system and for the command and safety accessories), as illustrated in Fig. 3.
!
Important
Made in Italy
the gate opener