Installation Instructions

ALL INSTALLATION WORKS TO BE CARRIED OUT BY COMPETENT PERSONNEL - INSTALL AS 
COMPLETE UNIT.

   Large Boort Bin

Large Boort Bin

1. Install suitable foundation pad (see illustration) with top face at ground level

2. Position bin in correct orientation with base centrally on foundation pad, then mark hole positions through base plates

3. Remove the bin; drill holes Ø12mm x 85mm deep or as manufacturer’s instructions

4. Clear debris from holes.

5. Reposition bin and fix to foundation pads using 3 no. zinc-coated M10 x 75mm sleeve anchors tightened to 50Nm (or 
    as per manufacturer’s instruction).  Ensure bin remains level during fixing process.

IMPORTANT NOTE:

Ensure that stainless steel is protected during site cutting of stone – contamination from disc cutters will produce corrosion on 
stainless steel components.

4

LARGE BOORT BIN installation

Fixing detail