8
3.3
Discharge and outlet requirements
•
Always use the supplied discharge materials for the supply
and discharge ducts. Only with use of these materials
Faber
can guarantee proper performance.
•
When installing against a flammable wall, a special wall
termination must be applied.
You can order this from Glen Dimplex Benelux BV.
3.4
Outlets
Check whether the outlet meets all local regulations with regards to
obstruction and vents.
>
Please note:
For proper functioning, the outlet must at least be 0.5m away
from:
•
Corners of the building.
•
Roof overhangs and balconies.
•
Eaves (with exception of the roof-ridge edge) (see chapter 12)
4 Preparation and installation
instructions
4.1
Gas connection
The gas connection must comply with the applicable local
standards.
We advise using a Ø 15mm gas connection directly from the gas
meter to the appliance, with a shut-off valve in the proximity of the
appliance, which must always be freely accessible.
Position the gas connection so that it is easily accessible at all
times for service, and that the burner unit can be disassembled.
4.2
Electrical connection
If for the power supply an adapter is used, then a 230VAC/50Hz
wall socket must be mounted near the fire.
4.2.1
Smart-Home installation
You can connect the control unit to the receiver with an external
source, such as a Domotica home automation system, using the
5-wire pin connector.
(part G60-ZCE/500 The total length of the cable may not exceed 8
meters, Signal relay (gold-plated contacts) or opto-couples are
recommended! Art. No.: 06022950).
4.3
Preparing the fire
•
Remove the fire and accessories from the packaging.
•
Clear a space to safely store the glass, if required.
•
If required, remove the glass and remove the packaged parts
from the fire.
•
Prepare the gas connection on the regulator.
4.4
Positioning the fire
Take the installation requirements into account (see Chapter 3).
•
First, determine the desired height of the platform and then
tape the template (horizontally) onto the wall at that height
(see Dimensional drawing 14.3).
•
The platform height marked on the template is 400mm.
Higher platform levels are possible as long as the ceiling
height “
G
” (size drawing 14.3) is not exceeded.
Lower installation is possible as long as “
F
” is not exceeded.
You may cut the template in intervals of 50 mm.
•
Mark and then drill all required holes.
•
Install the wall mount on the wall (fig. 1.1).
•
Hang the fire on the wall mount.
Vertically level the fire using the spacer at the bottom back of
the gas fire (fig. 1.2).
•
The feet underneath the fire can be retracted so that they are
out of sight. (fig. 1.3) To do this, loosen the bolt, slide the feet
upwards and then tighten the bolt.
4.5
Installing the flue gas discharge pipes
•
When penetrating a wall the opening must be at least 5mm
larger than the diameter of the discharge material.
•
Horizontal sections should be installed with a slope towards
the fire (3 degrees).
•
Build the system from the fire up (fig. 1.4). The sliding spacer
allows for easy installation.
>
Please note:
The slider must be fixed with a drill screw.
•
The wall duct may be shortened.
4.6
False chimney breast installation
Suspend the false chimney breast from the 4 protruding bolts of the
wall mount. Then secure it using the top two mounting holes (fig.
1.5).
4.6.1
False chimney breast top installation
The top of the false chimney breast can be installed without any
mounting materials.
(See fig. 1.6).
4.6.2
Finishing the false chimney breast
If possible, conduct a performance test of the fire before finalizing
the false chimney breast.
Chapter 7 “checking the installation”.
4.7
Platform installation
•
Install the platform according to fig. 1.7a and 1.7b
4.8
Mounting the decorative materials
•
First, install the left and right decorative materials securing
them with the adjustable magnetic snappers (fig. 1.8).
•
Then, install the lower decorative frame.
Prevent
damaging the platform (fig. 1.9).
I n s t a l l a t i o n I n s t r u c t i o n s
Содержание Concept III-700
Страница 1: ...Concept III 700 40011626 1551 Concept III 700 ENG ...
Страница 2: ...2 I n s t a l l a t i o n I n s t r u c t i o n s 1 1 1 2 B B A A 1 3 1 4 ...
Страница 3: ...3 I n s t a l l a t i o n I n s t r u c t i o n s 1 6 1 7b 1 5 1 7a ...
Страница 4: ...4 I n s t a l l a t i o n I n s t r u c t i o n s 1 9 2 2 1 8 2 1 B A ...
Страница 5: ...5 I n s t a l l a t i o n I n s t r u c t i o n s 3 2 3 1 3 4 3 3 ...
Страница 6: ...6 I n s t a l l a t i o n I n s t r u c t i o n s 4 2 4 4 4 1 4 3 ...
Страница 16: ...1 6 14 Dimensional drawings 14 1 Concept III 700 I n s t a l l a t i o n I n s t r u c t i o n s ...
Страница 17: ...1 7 14 2 Position gass connection I n s t a l l a t i o n I n s t r u c t i o n s ...
Страница 19: ...1 9 I n s t a l l a t i o n I n s t r u c t i o n s ...
Страница 20: ...www faber nl info faber nl Saturnus 8 NL 8448 CC Heerenveen Postbus 219 NL 8440 AE Heerenveen Dealerinfo ...