background image

min 40

min. 

0

min. 

50

57

A

580

290

290

290

a

a

A

B

90°

90°

ENGLISH

5

2) Position the bearing case level, respecting the indications in 
figure 7.
The centre of the hole on the case must be perfectly aligned 
with respect to the leaf rotation axis.

Take a PVC tube with

 6

 mm diameter to route the power cable. 

Insert it in the hole on the bearing case (Fig.1 ref.

q

) and take it 

to the electronic control unit. (See figure 8)
Provide a 50 diameter drain pipe, for rain water, so that it arrives 
at the nearest sewage channel (fig.8).
4) Wall the bearing case in the foundation pit.

Fig.7

5.3  FITTING THE GATE

    NOTE: 

Before you do this job, wait for the cement 

in the foundation pit to set. 

Fig.9

5.3.1 OPERATOR CBAC-SB

1) Dig a foundation pit as shown in Fig. 6.

Fig.6

    NOTE:    1)  To avoid the pit surface sinking, we advise  

you,  according  to  the  soil,  to  make  a  preparatory   
bottom over which to pour quick-setting cement.

 

   

2)  Fit  a  rain  water  drain  pipe  on  the   

bearing case, reaching the nearest sewer, as shown 
in Fig. 8 for example

LEAF ROTATION AXIS

LEAF ROTATION AXIS

1) Make the gate guide bracket, with a “U” profile with dimensions 
as in figure 9.

Fig.5

GUIDE 

BRACKET

DRAIN  

PIPE

Fig.8

1) Decide on the correct position of the bush, referring to the 
position of the leaf with respect to the rotation axis, as shown in 
Fig. 10-11

TUBE IN PVC FOR 

OPERATOR POWER 

CABLE

CONTROL 
UNIT

 “A” MEASUREMENT (mm)

Without 

mechanical 

release

With 

mechanical 

release

26 

47 

LEAF ROTATION  

AXIS

GUIDE BRACKET MID-POINT 

    NOTE: To exploit the operator’s entire rotation, the 

bearing case must be installed perpendicularly with 
respect to the closed position of the gate - as shown 
in Fig. 5.

Fig.10

Содержание S700H SB

Страница 1: ...4 5 3 FITTING THE GATE 5 5 3 1 OPERATOR CBAC SB 5 5 3 2 OPERATOR CBAC SB WITH MECHANICAL RELEASE 6 5 4 INSTALLING THE OPERATOR 7 5 4 1 OPERATOR WITHOUT MECHANICAL EMERGENCY RELEASE 7 5 4 2 OPERATOR WI...

Страница 2: ...ainst mechanical movement Risks such as crushing dragging and shearing 17 Use of at least one indicator light e g FAACLIGHT is recommended for every system as well as a warning sign adequately secured...

Страница 3: ...n the motor is not operating The model without a hydraulic shut down facility always requires one or more electrical locks to ensure the leaf is mechanically shut down The S700H automated systems were...

Страница 4: ...upply V dc 24 Absorbed power W 60 Protection class IP 67 Type of oil FAAC HP OIL Operating ambient temperature 20 C 55 C Rated Operating Time R O T Continous duty at 55 C Hydraulic shut down facility...

Страница 5: ...on pit as shown in Fig 6 Fig 6 NOTE 1 Toavoidthepitsurfacesinking weadvise you according to the soil to make a preparatory bottom over which to pour quick setting cement 2 Fit a rain water drain pipe...

Страница 6: ...12 2 Accurately weld the bush on the profile Fig 12 so that the notch on the bush corresponds to the profile mid point as shown in Fig 11 3 Fit the guide bracket on the bearing case Fig 13 To avoid c...

Страница 7: ...Insert and screw the fastening screws with groover and washer as shown in Fig 18 B ref a in order to secure the operator to the bearing case TO FACILITATE THE OPERATION SUPPORT THE MOTOR FROM THE CENT...

Страница 8: ...he key 6 Without moving the pinion insert the supplied key on the operator as shown in Fig 17 and make sure that it indicates 0 ZERO on the operator s plastic panel Fig 17 ref a If necessary rotate th...

Страница 9: ...the release lever toward you Fig 23 ref a 4 Move the leaf by hand Procedure for restoring the system to normal operation 1 Move the release lever back to its rest position Fig 22 2 Insert the release...

Страница 10: ...d the gate to close 6 While the leaf is moving loosen the closing bleed screw Fig 24 ref b 7 Using the bleed screw allow the air to come out from the hydraulic circuit until non emulsified oil appears...

Отзывы: