manualshive.com logo in svg
background image

15

ENGLISH

ENGLISH

The intercom is an optional item and can be supplied in two 

different models, named:

•  LEGACY

•  DELUXE

The connection of the intercom line for both models must be 

made via a terminal-board installed on a DIN guide, which is 

located under the interface board. To connect the conductors, 

refer to the lay-out shown in the following figure: 

Intercom connection

Fig. 13

NB.: connection to the intercom control unit depends on the 

model used. To this end, consult the manual of the intercom 

that was bought.

 5.  SETTING OF COMPONENTS

 5.1  DETECTOR CONFIGURATION 

The ParkLite Ticket Reader is supplied with the built-in DP2 

two-channel detector. This device is fitted in the interface 

board and detects vehicles transiting on the entrance lane. The 

following image shows the board’s essential components:

Detector DP2

The detector can be set by using the 8 dip-switches located at 

the side of the control board. Varying the position of each dip-

switch enables you to change the operational characteristics 

of this component. The following steps show all the 

configurations that can be performed. In addition to this, the 

tables show the recommended value in blue.

Sensitivity

For each channel, you can change the inductivity sensitiveness 

which a vehicle must vary to activate the relevant output of 

the detector. This parameter is adjusted separately for each 

channel, with the aid of two dip-switches

Frequency

The operating frequency of the detector can be configured 

on two levels, by dip-switches 4 and 8, separately for each 

channel. It is essential to differentiate the frequency among the 

channels of the detectors which command two adjacent loops, 

in order to avoid any kind of noise.

Presence time and reset

Dip-switches 3 and 7 enable you to set a continuous detection 

time of 5 minutes, after which a reset and a consequent self-set 

are performed automatically. This type of setting is normally 

not recommended for parking systems, because the cars may 

stay on the loops for some time, e.g. waiting for a vehicle to 

come out when the area is full.  

Signalling LEDs

The green LED signals that the detector channel is operating, 

whereas the red LED supplies information on the status of the 

relay according to loop condition. Signals are shown separately 

for each of the 2 channels.

The following table summarises the detected conditions.  

 4.3  INTERCOM CONNECTION 

Fig. 14

NB: for further information about the DP2 detector, please 

consult the manual of this device

Common contact

Line

Service

Green Led

Red Led

Channel 2

Green Led

Red Led

Channel 1

8 Frequency

7 Hold time

6 Sensitivity B

5 Sensitivity A

4 Frequency

3 Hold Time

Sensitivity B

Sensitivity A

Channel 1

Channel 2

Sensitivity

Channel 1

Channel 2

Low

DIP 01 = OFF

DIP 02 = OFF

DIP 05 = OFF

DIP 06 = OFF

Medium-Low

DIP 01 = ON

DIP 02 = OFF

DIP 05 = ON

DIP 06 = OFF

Medium-high

DIP 01 = OFF

DIP 02 = ON

DIP 05 = OFF

DIP 06 = ON

High

DIP 01 = ON

DIP 02 = ON

DIP 05 = ON

DIP 06 = ON

Frequency

Channel 1

Channel 2

Low

DIP 04 = OFF

DIP 08 = OFF

High

DIP 04 = ON

DIP 08 = ON

Presence time

Channel 1

Channel 2

5 minutes

DIP 03 = OFF

DIP 07 = OFF

Infinity

DIP 04 = ON

DIP 07 = ON

Detector Status

Green Led

Red Led

Not powered

OFF

OFF

Self-setting

Flashing light

OFF

Loop free

ON

OFF

Loop engaged

ON

ON

Faulty loop

OFF

ON

Содержание ParkLite TR

Страница 1: ...TR ParkLite rev A INSTALLATION MANUAL Ticket Reader ParkLite Ticket Reader ParkLite ...

Страница 2: ...irectives 73 23 EEC and subsequent amendment 93 68 EEC 89 336 EEC and subsequent amendment 92 31 EEC and 93 68 EEC and also conforms to the following standards EN 50081 1 EN 60555 2 IEC 801 2 EN 50082 1 EN 60555 3 IEC801 3 EN 60335 1 EN 55022 IEC 801 4 EN 60204 1 EN 55014 Additional notes This product underwent a test in a typical uniform configuration all products of FAAC S p A Bologna 01 January...

Страница 3: ...9 The installation must be carried out by observing standards EN12453 and EN12445 10 Before attempting any action on the system cut out the electrical power supply 11 Install an omnipolar switch upstream of the power supply line for the ParkLite Ticket Reader with contact opening distance of 3 mm or more We advise you to use a 6A thermal breaker with omnipolar switching 12 Make sure that a differe...

Страница 4: ...NDINGS 2 4 MASONRY PREPARATIONS 2 4 1 LAYING THE FOUNDATION PLATES 2 4 2 FASTENING 2 5 COMPONENT DIMENSIONS 2 6 PREPARATION OF CHANNELS 2 7 POSITION OF EQUIPMENT 3 ELECTRICAL PREPARATIONS 3 1 SAFETY INSTRUCTIONS 3 2 TYPES OF CABLES 4 ELECTRICAL CONNECTIONS 4 1 CONNECTIONS ON INTERFACE BOARD 4 2 DATA TRANSMISSION LINES 4 3 INTERCOM CONNECTION 5 SETTING OF COMPONENTS 5 1 DETECTOR CONFIGURATION 5 2 T...

Страница 5: ...can be connected to a specific intercom control unit optional which enables the operator to remotely communicate with the user situated on the exit lane Connection with two magnetic loops able to detect the pre sence and transit direction of the vehicle is obligatory for all models The engagement and disengagement of these sensors allows the Ticket Reader to enable the ticket card reading modules ...

Страница 6: ...OL UNIT COBRA 5000 P Lite board RAM CONTROL UNIT 512 KByte USER CAPACITY 5000 EVENT CAPACITY 15000 BARCODE READER One way laser scanner SCANNING RESOLUTION 16 lines SCANNING SPEED 1200 per second READ TICKET DETECTION Barcode with 22 characters 2 5 interleaved Tab 1 Characteristics present on all ParkLite Ticket Reader models Tab 2 Characteristics present only on ParkLite TR TAG Tab 3 Characterist...

Страница 7: ...ndicated in paragraph 3 2 Type of cables Furthermore all the instructions in paragraph General safety rules on page 3 must be respected and with reference to the specific electrical preparations as described in paragraph 3 1 Safety rules The Ticket Reader was designed to manage automatically the exit of vehicles from a parking area Therefore transit by pedestrians must be forbidden in the area res...

Страница 8: ...le insulation cable with a cross section of 1 5 mm2 inside it and then lay the loop thus constructed inside the chase NB in both cases respect the requirements specified in point 2 3 1 described up to here around the perimeter in which it must be constructed Procedure for the above operation insert the cable end from the sharp edge providing access into the chosen seat next run it inside for a set...

Страница 9: ...ow the dimensions in millimetres of the main lane equipment 2 4 MASONRY PREPARATIONS The foundation plate for securing the Ticket Reader is identical to the one used for installing the 620 barrier The drawing be low shows the dimensions and methods for laying them both 2 4 1 LAYING THE FOUNDATION PLATES Ticket Reader Dimensions Fig 6 Dimensions of 620 Barrier Fig 7 Dimensions in mm Fig 5 The dimen...

Страница 10: ...ercom serial data line etc Furthermore appropriately size the diameter of the cable ducts to be laid in relation to the cross section and number of cables to be inserted To this end please refer to section 3 Electrical preparations of this manual Channel lay out for Exit lane Driving direction 1 Input of Ticket Reader power cables 2 Input and output of cables for data transmission line on RS 485 p...

Страница 11: ...switch with a threshold of 0 03A is installed upstream of the system Make sure that the earthing system is expertly made and connect to it the metal parts of the closing element Apply all the instructions described in the preceding points to all the lane devices in addition to the Ticket Reader Fig 12 Foundation plate for ParkLite column Foundation plate for 620 rapid barrier RH version Driving di...

Страница 12: ...col All devices must be multidrop connected as shown in lay out Data Line Connections 5 Shielded cable for intercom 2 x 1 5 mm if Legacy model Telephone pair 0 4 mm 275 Ohm Km Line Double wire or telephone pair 0 6 mm 122 Ohm Km Line Double wire if Deluxe model 6 Flame retardant cable 2 x 0 5 mm input for barrier closure safety 7 Flame retardant cable 3 x 0 5 mm open closed barrier commands Power ...

Страница 13: ...op output C Transit loop output NC Presence loop output NA Presence loop output C Presence loop output Input 6 additional Common input Comune Open Closed Barriera Closed Barrier Open Barrier Input 2 Input 6 Additional inputs Vehicle detection loops on exit lane 620 640 barrier configured in P logic Barrier photocell 620 640 barrier configured in P logic Sch RS 485 Polling Out RS 485 Polling Out RS...

Страница 14: ...stem uses NET stations both the concentrator PC and the NET PC must have a static address assigned to them The fundamental parameters for network connection between PCs such as IP address Netmask Gateway etc must be supplied by the customer s network administrator RS 485 Data transmission line Use a paired twisted and screened cable for transmission on data network with RS 485 protocol type Belden...

Страница 15: ...tely for each channel It is essential to differentiate the frequency among the channels of the detectors which command two adjacent loops in order to avoid any kind of noise Presence time and reset Dip switches 3 and 7 enable you to set a continuous detection time of 5 minutes after which a reset and a consequent self set are performed automatically This type of setting is normally not recommended...

Страница 16: ...et Reader is powered up the Cobra P Lite control unit controls the function to which it is delegated through the jumper fitted on the CN1 connector and it sets itself to manage all the specified devices for that use Therefore this jumper must be correctly fitted Obviously the Ticket Reader is supplied with the jumper already set in the right position Fig 15 shows all the settings which can be carr...

Страница 17: ...d Output 1 M7 CN1 on Interface board Closed Barrier Command Output 2 M6 Not connected Output 3 M5 Not connected Output 4 M4 CN2 on Interface board Inputs loops engage disengage in5 and in1 area down count or reserve remaining M13 Ticket Reader Scanner Receive the data of the ticket read by the laser scanner Pratic 503 Destination Function CM1 M1 on Cobra P Lite board Connection of reader input to ...

Отзывы: