34
35
36
37
J275 2K HA
21
532208 - Rev.A
1
2
5
24
35 Nm
2
1
3
3
1
2
3
4
5
6
15
14
12
13
11
OUT 1
OUT 2
GND
+24 V
+24 V
OUT 3
8
9
7
10
STOP
FSW
EMERGENCY
GND
0
19
18
OUT 4
GND
16
17
15
14
12
13
11
6
CLOSE
OUT 1
OUT 2
OUT 3
GND
+24 V
+24 V
OUT 3
8
9
7
10
STOP
FSW
EMERGENCY
GND
0
Tr
ansla
tion of the original instruc
tions
ENGLISH
7. INSTALLING OPTIONAL EQUIPMENT
7.1 INSTALLING THE PRESSURE SWITCH
1.
34
Remove the hydraulic unit following points 1 to 5 in the §
"Removing the hydraulic unit” section.
2. Place the hydraulic unit in a horizontal position.
3. Remove the plug from the flange
1
and the plug from the cable
gland
2
.
4.
35
Screw the pressure switch
1
onto the flange, together with
the seal provided. Insert the cable in to the cable gland
2
and
connect it to connector
3
inside the junction box according to the
diagram shown in the figure.
Pink
Blue
Blue
Violet
L
Make sure that terminals 9 and 10 of the external junction box
of the bollard are connected to the JE275 control board as per
25
. Otherwise, connect them now.
Carry out a bleed cycle after having reinstalled the hydraulic unit.
MULTIPLE CONNECTIONS
If multiple bollards (max 3) are installed, which are controlled by a
single JE275 board, connect the pressure switches in series as indi-
cated in the following diagram.
If multiple bollards (more than 3) are installed, which are controlled
by JE275 boards in a master / slave configuration, connect all the pres-
sure switches in series on the inputs of the master board as indicated
in the following diagram.
Master JE275 board
Содержание J275 2K HA
Страница 1: ...J275 2K HA...