12
13
14
15
J275 2K HA
12
532208 - Rev.A
1
2
3
5
Tr
ansla
tion of the original instruc
tions
ENGLISH
4.5 INSTALLING THE BOLLARD
!
Use a 1.5mm
2
16 core (15 + earth) cable for the electrical connec-
tions. Use a cable that complies with local regulations for use with
230 V~.
The maximum cable length is 50 m.
1. Place the cable inside the flexible sheath and make it protrude
from the pit by 1.6m.
2.
12
Fasten the cable to the frame using the cable gland pro-
vided
1
.
3. Insert the cable into the external junction box
3
through the cable
gland provided
2
.
4. Connect the conductors to the external junction box and the
control board following the instructions in section § 5.1.
5. Check that the bollard operates correctly, according to the logics
set on the board, as well as all the accessories that are connected.
6. Remove the top cover
13
.
7. Screw the two M10 eyebolts, provided, onto the top of the frame
14
.
8. Lift the bollard and insert it completely into the pit.
15
.
Position
the bollard so that the junction box is on the same side as the cable inlet.
!
Use belts or chains and a lifting device that are suitable for the weight
of the bollard.
Take care not to damage the electrical cable by pinching it between
the frame and the pit.
Содержание J275 2K HA
Страница 1: ...J275 2K HA...