5.2  MASONRY FOR FOUNDATION PLATE 

1.  Assemble the foundation plate as shown in Fig. 4.
2.  The foundation plate must be located as shown in Fig. 5 

(right closing) or Fig. 6 (left closing) to ensure the rack and 

pinion mesh correctly.

Dimensions in mm

Positioning of plate with

GALVANISED STEEL rack

NYLON rack

right closure

Positioning of plate with

GALVANISED STEEL rack

NYLON rack

left closure

Dimensions in mm

This symbol 

must 

always face to-

wards the gate

3.  Prepare a foundation plinth as shown in Fig. 7 and wall in the 

foundation plate, supplying one or more sheaths for routing 

electric cables through the hole in the foundation plate.

  Using a spirit level, check if the plate is perfectly 

level. 

 

Wait for the cement to set.

4.  Lay the electric cables for connection to the accessories 

and power supply as shown in Fig. 3. 

 To facilitate the connections in the control unit, 

pull out the leads by at least 30 cm from the 

hole on the plate.

Dimensions 

in mm

Dimensions 

in mm

Содержание C720

Страница 1: ...C720 C721 C720 C721...

Страница 2: ...circuit break is recommended 13 Make sure that a differential switch with threshold of 0 03 A is fitted upstream of the system 14 Make sure that the earthing system is perfectly constructed and connec...

Страница 3: ...AIR 10 11 ACCESSORIES 10 11 1 BATTERY KIT 10 11 2 RADIO MODULE 10 CE DECLARATION OF CONFORMITY FOR MACHINES DIRECTIVE 2006 42 EC Manufacturer FAAC S p A Address Via Calari 10 40069 Zola Predosa BOLOGN...

Страница 4: ...power cut if emergency batteries are not installed or if the operator is not in service 1 Cover casing 2 Motor lock 3 Link cover 4 Motor release handle 5 Transformer 6 Foundation plate 7 Cable passag...

Страница 5: ...ed plus mechanical limit switches to prevent the gate derailing The gate slide track must be linear and horizontal Manual movement of the gate must be easy throughout its travel The soil must permit s...

Страница 6: ...late with GALVANISED STEEL rack NYLON rack left closure Dimensions in mm This symbol must always face to wards the gate 3 Prepare a foundation plinth as shown in Fig 7 and wall in the foundation plate...

Страница 7: ...nsions in mm with rack in GALVANISED STEEL 3 Adjust the height of the gearmotor and the distance from the gate with reference to the dimensions in Fig 10 Operation required for correct fastening of th...

Страница 8: ...en the rack and the gate positioning it at the top of the slot In this way the slot play will enable any adjustments to be made 3 Mark the drilling point on the gate Drill a 6 5 mm hole and apply thre...

Страница 9: ...ting any work on the control board connections programming mainte nance always turn off power Observe points 10 11 12 13 14 of the GENERAL SAFETY OBLIGATIONS Follow the instructions in Fig 3 to arrang...

Страница 10: ...eration of the automated system approximately 40 mm must be left from the mechanical limit switches 7 TESTING THE AUTOMATED SYSTEM Once the operator has been installed carry out a thorough operational...

Страница 11: ...of the safety devices including the motor thrust force which must comply with current standards and of the release devices 10 REPAIR Contact an authorised Repair Centre for repairs 11 ACCESSORIES 11...

Страница 12: ...f after the selected pause time If semi automatic operating mode has been selected a second pulse must be sent to re close the gate An opening pulse issued during the re closing stage always causes a...

Страница 13: ...79 6645 faactm info faacgroup com www faac de INDIA FAAC INDIA PVT LTD Noida Delhi India tel 91 120 3934100 4199 www faacindia com IRELAND NATIONAL AUTOMATION LIMITED Boyle Co Roscommon Ireland tel 35...

Отзывы: