background image

C720-C721 

732568 - Rev.E

Fig. 8

Fig. 10

Fig. 9

ENGLISH

T

ranslation of the original instructions

5.3  MECHANICAL INSTALLATION 

1.  Remove the cover casing by loosening the two suitable side bolts and lifting it (Fig. 8).
2.  Position the operator on the foundation plate using the nuts and washers provided as shown in Fig. 9. During this operation, 

pass the cables though openings in the motor casing (see Fig. 9 re. 

).

Dimensions in mm with rack in 

REINFORCED NYLON

Dimensions in mm with rack in 

GALVANISED STEEL

3.  Adjust the height of the gearmotor and the distance from the gate with reference to the dimensions in Fig. 10. 

 Operation required for correct fastening of the rack and to keep open the option of new adjustments.

4.  Secure the gearmotor to the plate by tightening the fasten-

ing nuts.

5.  Prepare the gearmotor for manual operating mode as 

described in paragraph 8.

Make  sure  that 

Make sure that 

t h e   g a t e ,   o r 

t h e   g a t e ,   o r 

p a r t s   o f   i t , 

p a r t s   o f   i t , 

doesn’t  touch  the 

doesn’t touch the 

pinion  support  during  

pinion support during  

the whole movement. 

the whole movement. 

Fig. 8 and Fig. 9 refer to operator C720

Содержание C720

Страница 1: ...C720 C721 C720 C721...

Страница 2: ...circuit break is recommended 13 Make sure that a differential switch with threshold of 0 03 A is fitted upstream of the system 14 Make sure that the earthing system is perfectly constructed and connec...

Страница 3: ...AIR 10 11 ACCESSORIES 10 11 1 BATTERY KIT 10 11 2 RADIO MODULE 10 CE DECLARATION OF CONFORMITY FOR MACHINES DIRECTIVE 2006 42 EC Manufacturer FAAC S p A Address Via Calari 10 40069 Zola Predosa BOLOGN...

Страница 4: ...power cut if emergency batteries are not installed or if the operator is not in service 1 Cover casing 2 Motor lock 3 Link cover 4 Motor release handle 5 Transformer 6 Foundation plate 7 Cable passag...

Страница 5: ...ed plus mechanical limit switches to prevent the gate derailing The gate slide track must be linear and horizontal Manual movement of the gate must be easy throughout its travel The soil must permit s...

Страница 6: ...late with GALVANISED STEEL rack NYLON rack left closure Dimensions in mm This symbol must always face to wards the gate 3 Prepare a foundation plinth as shown in Fig 7 and wall in the foundation plate...

Страница 7: ...nsions in mm with rack in GALVANISED STEEL 3 Adjust the height of the gearmotor and the distance from the gate with reference to the dimensions in Fig 10 Operation required for correct fastening of th...

Страница 8: ...en the rack and the gate positioning it at the top of the slot In this way the slot play will enable any adjustments to be made 3 Mark the drilling point on the gate Drill a 6 5 mm hole and apply thre...

Страница 9: ...ting any work on the control board connections programming mainte nance always turn off power Observe points 10 11 12 13 14 of the GENERAL SAFETY OBLIGATIONS Follow the instructions in Fig 3 to arrang...

Страница 10: ...eration of the automated system approximately 40 mm must be left from the mechanical limit switches 7 TESTING THE AUTOMATED SYSTEM Once the operator has been installed carry out a thorough operational...

Страница 11: ...of the safety devices including the motor thrust force which must comply with current standards and of the release devices 10 REPAIR Contact an authorised Repair Centre for repairs 11 ACCESSORIES 11...

Страница 12: ...f after the selected pause time If semi automatic operating mode has been selected a second pulse must be sent to re close the gate An opening pulse issued during the re closing stage always causes a...

Страница 13: ...79 6645 faactm info faacgroup com www faac de INDIA FAAC INDIA PVT LTD Noida Delhi India tel 91 120 3934100 4199 www faacindia com IRELAND NATIONAL AUTOMATION LIMITED Boyle Co Roscommon Ireland tel 35...

Отзывы: