1 4
1 3
B614 21
732998 - Rev.A
1
2
4
1
1
2
3
Tr
ansla
tion of the orig
inal instruc
tions
ENGLISH
FIXING THE CABLES INSIDE THE BARRIER
L
i
130 cm of cable are necessary.
1. (
) Arrange the cables inside the barrier. Fix
the cables with the cable ties provided
1
,
2
and
3
.
2. (
) Remove bolt with washer
1
. Open cable
tie
2
. Bring the cables to the board.
3. Use the screw and washer
1
to close the cable tie.
L
i
The electrical connections must be made after com-
pleting the mechanical installation