manualshive.com logo in svg
background image

2

INSTALLATION

Manual release the operator that the stop is going to be installed on and pull the piston rod out 4 to 6 inches. 

See the installation manual for detailed instructions on manual releasing your operator.
With the piston extended as told above place the 6mm lock washers on the 6mm bolts supplied in the hardware 

package. Align the holes of the bottom base plate with the 4 “towers” located on the front of the 400 operator. 

Insert all 4 bolts and tighten with a 10 mm wrench. (See Fig. 1)
With the piston rod sticking through the bottom 2 plates, screw the square swivel joint (provided) and the jam nut 

into the threaded end of the piston rod. This plate and swivel joint are to insure a square stopping point for the 

closed position on an inward swing gate and square stopping point on an outwards swing gate. (See Fig. 2)
Continue to install the operator as instructed in it’s installation manual. When the operator is securely in place 

then the stop can be adjusted.
Start by closing the gate all the way. Adjust the closed stop by loosening the jam bolts and sliding the plate in the 

direction needed to hit the square swivel joint and stop the gate. Once the stopping point had been established 

tighten the jam nuts securely with a couple of 13mm wrenches. Then move the gate all the way open and adjust 

the open stop by loosening the jam nuts and sliding the plate in the direction needed to hit the square swivel joint 

and stop the gate. Once the stopping point has been established tighten the jam bolts securely with a couple of 

13 mm wrenches. (See Fig. 3)
Recheck that all nuts and bolts are tight and that the gates are stopping where desired.

Model 84 - 84EG positive stops

Fig. 1

Отзывы: