10. ASSEMBLY OF THE CN 60E CONTROL

UNIT (OPTIONAL)

The operator is designed to house - with the aid of a DIN bar -
the control unit of the CN 60E conductive safety edge. Cut the
DIN bar to measure and secure it to the operator with two screws
in the two appropriate holes, and hook on the CN 60E control
unit (Fig. 28).
For connection and operation, consult the specific instructions.

11. SPECIAL APPLICATIONS

There are no special applications.

12.

MAINTENANCE

Run a functional check of the system at least every 6 months,
with special attention to the efficiency of the safety devices
(Including the thrust force of the operator) and release devices.

13. REPAIRS

For repairs, contact FAAC authorised Repair Centres.

Periodically check quantity of oil inside the operator.
An annual check is sufficient for low to medium use frequency;
for heavier duty, check every 6 months.
To access the tank, temporarily remove the oil filling plug (Fig.29).
Oil visual check: oil must touch the copper windings of the
electric motor.
To top up, pour in oil up to the level.
Use only FAAC XD 220 oil.

12.1. TOPPING UP OIL

Содержание 844R 3P

Страница 1: ...ata 100 per la natura for nature recycled paper 100 ist umweltfreundlich 100 Altpapier para la naturaleza 100 papel reciclado papier recycl 100 pour la nature voor de natuur 100 kringlooppapier 844R 3...

Страница 2: ...observe Good Technique in the constructionoftheclosingelementstobemotorised orforanydeformation thatmayoccurduringuse 10 TheinstallationmustconformtoStandardsEN12453andEN12445 Fornon EUcountries toobt...

Страница 3: ...h p 3 0 0 4 Table1 TECHNICALSPECIFICATIONSOFGEARMOTOR These instructions apply to the following model 844R 3Ph The FAAC mod 844R 3Ph automation for sliding gates is an electromechanical operator power...

Страница 4: ...r electrical cables in the plinth excavation area If the gearmotor is exposed to passing vehicles if possible fit adequate guards to protect against accidental impact Check if an efficient earth plate...

Страница 5: ...dation plate tightening the nuts as shown in Fig 12 4 4 INSTALLING THE RACK 4 4 1 STEEL RACK TO BE WELDED Fig 13 1 Fit the three threaded pawls on the rack element locating them in the upper part of t...

Страница 6: ...ack elements either to the spacer or to each other After installing the rack to ensure correct meshing with the pinion gear we advise you to lower the position of the gearmotor by approximately 1 5 mm...

Страница 7: ...a transiting plate fitted on the top of the rack it commands gate motion to stop Procedure for correct positioning of the two supplied plates 1 Assemble the limit sensor centring the plate with respe...

Страница 8: ...ON If the gate has to be moved manually due to a power cut or fault of the automatic system use the release device as follows 1 Open the protective door and fit the supplied key in the lock Fig 26 2 T...

Страница 9: ...s 12 MAINTENANCE Run a functional check of the system at least every 6 months with special attention to the efficiency of the safety devices Including the thrust force of the operator and release devi...

Страница 10: ...uipment receives an opening command by remote control or from another suitable device it activates the motor until the opening position is reached If automatic operating mode was set the gate closes a...

Страница 11: ...chappen van de apparaat gehandhaafd blijven zonder zich daardoor te verplichten deze publicatie bij te werken Timbro del Rivenditore Distributor s Stamp Timbre de l Agent Fachh ndlerstempel Sello del...

Отзывы: