3. 

Close the containment frame as shown in fig.13 and 14.

4. 

Weld the leaf containment frame to the leaf support frame, fig.15.

5. 

Assemble all parts as shown in fig.16.

6. 

Carefully grease the rotation pin and the ball.

  Do not grease the release device.

7. 

Position the leaf and secure the upper hinge.

8. 

Manually move the leaf to ensure correct positioning.

9. 

Secure the leaf to the containment frame using a through screw, fig.17. 

  Do not weld the leaf to the containment frame.

4.5  INSTALLING THE GEARMOTOR

1. 

Place

 the gearmotor in the box as shown in

 fig.18, using

 the provided 

handle

 ref.

 for

 handling.

  To correctly position the gearmotor, refer to figure 19. In any case, 

the gearmotor transmission shaft must be on the side opposite gate 
opening.

2. 

Secure the gearmotor using the provided nuts and washers.

3. 

Install the transmission levers as shown in fig.20.

 Grease the lever pins.

 The gears of the 180° plate (optional) do not require greasing.

4. 

Fit any optional accessories, see the paragraph titled "Accessories”.

4.6 ELECTRICAL CONNECTIONS

1. 

Insert

 the motor power cable in the previously laid tube

.

2. 

Make all the connections with the electrical cabinet, following the in-
structions provided with the cabinet itself.

  If the motor cable needs to be extended, provide for shunt boxes 

with a protection class IP 67 or greater, inside the supporting box.

  Use a cable suitable for outdoor laying, having the proper diameter, 

as described in the paragraph "Electrical preparations”.

3. 

Insert the plug, fig.21 ref.

.

4. 

Close the cover of the supporting box, fig.21 ref.

.

5. 

Screw in the cover using the provided screws.

5. START-UP

1. 

Programme

 the control equipment according to need

.

2. 

Ensure that the automated system is operating correctly.

3. 

Check that the safety devices operate correctly.

4. 

Fill in the maintenance report, contained in the middle of this manual, 
and give it to the end user.

5. 

Properly train the end user as to the correct operation of the automated 
system.

6. 

Give the end user the "User's Guide" that is contained in the middle of 
the manual.

6. MANUAL OPERATION

1. 

Use

 the differential switch located upstream from the system to cut 

off power

.

2. 

Open the lock covering the plug, fig.22 ref.

.

3. 

Insert the key and turn it until it stops, fig.22 ref.

.

4. 

Open the release lever, fig.22 ref.

.

5. 

Manually move the leaf, fig.22 ref.

.

6. 

Place the release lever back in position.

7.  RESTORING NORMAL OPERATION

1. 

Use

 the differential switch located upstream from the system to cut 

off power

.

2. 

Manually move the leaf until the release device engages, fig.23 ref.

.

3. 

Place the release lever in rest position, fig.23 ref.

.

4. 

Turn the key until it stops, fig.23 ref.

.

5. 

Close the protective plug, fig.23 ref.

.

6. 

Ensure that the leaf cannot be moved manually.

7. 

Power on the system and perform a few cycles to ensure that the auto-
mated system is operating correctly.

8. AVAILABLE ACCESSORIES

Mechanical limit stops

The mechanical limit stops have been designed to replace the mechanical 
beats of the leaf (fig.24).
To install the stops, refer to the related instructions.

  The mechanical limit stops cannot be used with the 180° opening 

kit.

Kit 180°

This kit lets you obtain a leaf rotation of up to 180° (fig.25).

  If this kit is used, you cannot use the mechanical limit stops inside 

the box.

To install the kit, refer to the related instructions.

Kit 140°

This kit lets you obtain a leaf rotation of up to 140° (fig.26)

 Con l’utilizzo degli arresti meccanici all’interno della cassetta di 

fondazione la rotazione dell’anta è limitata a 

~

120°.

To install the kit, refer to the related instructions.

Encoder

The encoder is used to detect possible obstacles that prevent normal ope-
ration of the automated system (fig.27 example of installation combined 
with kit 180°).
To install the encoder, refer to the related instructions.

Magnetic limit switch

Using this kit - fig.28 - you can determine the leaf stopping point or the 
start of the decelerated segment, depending on the characteristics of 
the control board used.

  Use of the magnetic limit switch requires the use of a control unit 

that supports limit switches.

  The magnetic limit switch cannot be installed with the 180° kit 

and encoder.

To install the kit, refer to the related instructions.

9. MAINTENANCE

Inspect the system every 

six months

, as provided for in current safety 

regulations.
The "User's Guide" contains a servicing report form.

10. REPAIRS

Do not make any attempts at repairs and contact only qualified 
FAAC S.p.A. personnel and service centres.

11. SPECIAL APPLICATIONS

No special applications have been provided for, any use not described 
in this manual is strictly forbidden.

Содержание 770 N

Страница 1: ...770 N 770 N...

Страница 2: ...START UP 4 6 MANUAL OPERATION 4 7 RESTORING NORMAL OPERATION 4 8 AVAILABLE ACCESSORIES 4 9 MAINTENANCE 4 10 REPAIRS 4 11 SPECIAL APPLICATIONS 4 CE DECLARATION OF CONFORMITY Manufacturer FAAC S p A Ad...

Страница 3: ...H 127 Supporting box dimensions mm See fig 3 Values obtained from laboratory testing 4 INSTALLATION Max usage curve The curve fig 4 makes it possible to identify the maximum operation time T dependin...

Страница 4: ...covering the plug fig 22 ref 3 Insert the key and turn it until it stops fig 22 ref 4 Open the release lever fig 22 ref 5 Manually move the leaf fig 22 ref 6 Place the release lever back in position 7...

Страница 5: ...8 9 2 3 6 5 4 10 10 7 0 5 100 1 1 25 1 5 1 8 2 2 25 2 5 3 3 25 3 5 200 300 400 500 600 Kg mt 307 5mm 430mm 156mm 214mm 1 10 2 3 4 5 6 7 8 9 10 11 12 20 30 40 50 60 70 80 90 100 h 1 1 5 6 4 3 3 4 2 68...

Страница 6: ...770 N 6 732615 Rev A 65 mm 440 mm 315 mm 440 mm 156 mm 315 mm 35mm max 50mm max C 340mm Min 40mm C 1mm Min 10mm...

Страница 7: ...770 N 7 732615 Rev A 1 OPEN OPEN 1 2 3 4 2 1 1 2 3 4 22 21 23...

Страница 8: ...770 N 8 732615 Rev A 24 25 26 27 28...

Страница 9: ...770 N 770 N User s Guide...

Страница 10: ...e When in rest position the gate leafs are closed When a pulse is sent the unit sets the motor in motion which will begin to open the leafs until opening is complete Once the opening phase is complete...

Страница 11: ..._____________________________________________ Technician Customer _____________________________________________ _____________________________________________ _________________________________________...

Страница 12: ...c com au INDIA FAAC INDIA PVT LTD Noida Delhi India tel 91 120 3934100 4199 www faacindia com SWITZERLAND FAAC AG Altdorf Switzerland tel 41 41 8713440 www faac ch CHINA FAAC SHANGHAI Shanghai China t...

Отзывы: