manualshive.com logo in svg
background image

10

10

UNLOCK

LOCK

OPEN

USER’S GUIDE

Read the instructions carefully before using the product and store
them for future use

GENERAL SAFETY REGULATIONS

If correctly installed and used, the 402 automated system ensures
a high degree of safety.
Some simple rules on behaviour can prevent accidental trouble:
-

Do not pass between the leaves when they are moving. Wait
for the leaves to open fully before passing through them.

-

Do not, on any account stay in between the leaves.

-

Do not stand near the automated system, and do not allow
children, persons or things to do so, especially when it is
operating.

-

Keep remote controls or other pulse generators away from
children, to prevent the automated system from being
activated involuntarily.

-

Do not allow children to play with the automated system.

-

Do not willingly obstruct leaves movement.

-

Prevent any branches or shrubs from interfering with leaves
movement.

-

Keep indicator-lights efficient and easy to see.

-

Do not attempt to activate the leaves by hand unless you have
released them.

-

In the event of malfunctions, release the leaves to allow access
and wait for qualified technical personnel to do the necessary
work.

-

When you have set manual operation mode, cut power to the
system before restoring normal operation.

-

Do not in any way modify the components of the automated
system.

-

Do not attempt any kind of repair of direct action whatever
and contact qualified personnel only.

-

At least every six months: arrange a check by qualified
personnel of the automated system, safety devices and earth
connection.

DESCRIPTION

These instructions apply to the following models:

402 CBC - 402 SBS.

The FAAC 402 automated system for swing leaf gates consists of a
hydraulic enbloc composed of an electric pump and a hydraulic
piston which transmits drive to the leaf.
The models with a hydraulic locking do not require installation of
an electric lock, as they guarantee mechanical locking of the leaf
when the motor is not operating.

The other models, without a hydraulic locking always require one
or more electric locks to ensure the leaf is mechanically locked.
Leaves of up to 3 mt can be automated depending on the
selected model.
The functioning of the operators is controlled by an electronic
control unit, housed in an enclosure with adequate degree of
protection against atmosphere agents.
The leaves are normally closed.
When the electronic control unit receives an opening command
from the radio control or any other pulse generator, it activates
the hydraulic appliance which rotates the leaves until they reach
the opening position to allow access.
If automatic mode was set, the leaves close automatically after
selected pause time has elapsed.
If the semi-automatic mode was set, a second pulse must be sent
to close the leaf again.
A stop pulse (if supplied) always stops movement.
For details on the behaviour of the automated system in different
function logics, consult the installer.
Automated systems include safety devices (photocells) that
prevent the leaves from moving when there is an obstacle in the
area they protect.
The 402 automated system is supplied standard with a hydraulic
anti-crush protection safety device (BY-PASS) which limits the
torque transmitted to the leaves.
The warning-light indicates the current leaf movement.

MANUAL OPERATION

If the gate has to be moved manually due to a power cut or fault
of the automated system, use the release device as follows:

- Insert the triangular key on the release screw located in the lower

part of the flange (Fig.1).

- Turn the release key anti-clockwise for about two turns.
- Open or close the leaf manually.

RESTORING NORMAL OPERATION MODE

To prevent an involuntary pulse from activating the operator  during
the manoeuvre, cut power to the system before re-locking the
operator.
- To re-lock the operator, turn the key clockwise until it stops (Fig.

1).

- Release the operator from the front and rear attachments.

AUTOMATED SYSTEM 402

Fig. 1

Содержание 402

Страница 1: ...Leading the way Installation Manual 402 Leading the way Leading the way Swing Gate System ...

Страница 2: ...RAL RULES FOR DETERMINING THE INSTALLATION DIMENSIONS p 4 3 3 INSTALLATION OF THE OPERATORS p 4 4 START UP p 6 4 1 ADJUSTING THE ANTI CRUSHING SYSTEM p 6 5 FINAL OPERATIONS p 7 6 AUTOMATED SYSTEM TEST p 7 7 MANUAL OPERATION p 7 8 RESTORING NORMAL OPERATION MODE p 7 9 MAINTENANCE p 7 10 REPAIRS p 7 11 TROUBLE SHOOTING p 8 Read this instruction manual to the letter before you begin to install the pr...

Страница 3: ...nger areas against mechanical movement Risks such as crushing dragging and shearing 16 Use of at least one indicator light e g FAACLIGHT is recommended for every system as well as a warning sign adequately secured to the frame structure in addition to the devices mentioned at point 15 17 FAAC declines all liability as concerns safety and efficient operation of the automated system if system compon...

Страница 4: ...alves Gerotor pump Operators mod 402 provide a connector block for each operator Photocells Electronic control unit Key operated push button T 10 Radio receiver Flashing light Electric lock if necessary 1 To lay the electrical cables use adequate rigid and or flexible pipes 2 Always separate the connection cables of the low voltage accessories from the 230 V power cables Use separate sheaths to av...

Страница 5: ...compromising good operator functionality we recommend you to respect the indicated dimensions For iron pilasters accurately weld the rear attachment ref Fig 6 directly on the pilaster For masonry pilasters select one of the following solutions A appropriately lay a walling in plate and then accurately weld the rear attachment B secure with screws and expansion plugs the rear attachment plate ref a...

Страница 6: ...e leaf with two weld spots protecting the rod against any welding waste If the gate structure does not permit the attachment to be firmly fastened take action on the structure creating a solid support base 9 Release the operator and manually check if the gate is free to open completely stopping on the travel limit mechanical stops and if leaf movement is good and friction free 10 Definitively weld...

Страница 7: ...automated system has an anti crushing safety device which limits the operator s force if an obstacle is encountered while the gate is moving To adjust the intervention threshold of the anti crushing system turn the By Pass screws on the flange FIG 12 the red screw controls closing movement torque the green screw controls opening movement torque To increase torque turn the screws clockwise To reduc...

Страница 8: ...kwise until it stops Fig 15 Lastly remove the key and restore the power supply to the system 9 MAINTENANCE Run a functional check of the system at least every 6 months with special attention to the efficiency of the safety and release devices Including the thrust force of the operator and to perfect operation of the gate hinges Also periodically check quantity of oil inside the tank Oil level chec...

Страница 9: ... chapter 9 Fig 16 Check the connection and operation of the thrust capacitor Check the efficiency of the electronic control unit Check the adjustment of the anti crushing system paragraph 4 1 Make sure that you have removed the breather screw chapter 5 Run some complete gate opening and closing cycles in order to release any air inside the piston An initial minimum oil leak is normal A larger leak...

Страница 10: ... _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ n a i c i n h c e T r e m o t s u C 9 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _...

Страница 11: ...an electric lock as they guarantee mechanical locking of the leaf when the motor is not operating The other models without a hydraulic locking always require one or more electric locks to ensure the leaf is mechanically locked Leaves of up to 3 mt can be automated depending on the selected model The functioning of the operators is controlled by an electronic control unit housed in an enclosure wit...

Страница 12: ......

Страница 13: ...gstoke RG21 6YT Telephone 01256 318100 Fax 01256 318101 Email sales faac co uk Website www faac co uk V5 01 07 Your authorised FAAC dealer Your authorised FAAC dealer The descriptions and illustrations contained in this manual are not binding FAAC reserve the right whilst leaving the main features of the main equipment unaltered to undertake any modifications it holds necessary for either technica...

Отзывы: