background image

A13

AC Power Wiring Guidelines

1.  Check local wiring codes in all cases and follow all 

local building codes. Wiring and hookup should be 

performed by qualified electricians/installers only.

2.  AC power should be supplied from a circuit breaker 

panel and must have its own dedicated circuit breaker. 

This supply must include a green ground conductor.

3.  Properly ground the gate operator to minimize or 

prevent damage from power surges and/or lightning. 

Use a grounding rod if necessary. A surge suppressor is 

recommended for additional protection.

BLACK

RED (230V)

GREEN

WHITE

115V  LINE

115V  LINE

GROUND

NEUTRAL

115 V

230 V

 

 

TX

TX

RX

RX

PHOTO

 OP

OPEN

DEVICES

PHOTO

CL

24VDC

RX PHOTO

24VDC

TX PHOTO

+     -

+     -

SHADOW

INPUT

TEST

BUTTON

24VDC

RX PHOTO

24VDC

RX PHOTO

a     b

a     b

PHOTO

 OP

a

b

a

b

OPEN SAFETY MONITORED

CLOSE SAFETY MONITORED

-

+

-

+

PHOTO

CL

Monitored safety connections

The prewired enclosure comes with dedicated terminal 

blocks for the connection of safety photocells that can be 

monitored by the control board for presence and correct 

operation.

Connect the trasnsmitter photocells as shown on the draw-

ing, to the dedicated TX photo outputs. Connect the receiver 

photocells 24V power to the dedicated outputs on the 

terminal block as shown. Connect the N.C. outputs of the 

photocells to the dedicated terminal blocks. 

IMPORTANT: To enable monitoring of the photocells make 

sure that FAIL-SAFE mode is turned on in the advanced pro-

gramming menu:

F

+

+

ADVANCED PROGRAMMING

FAIL SAFE:

If this function is activated, it enables a 
function test of the photocells before any 
gate movement. If the test fails (photocells 
not serviceable), the gate does not start the 
movement.

 

= Active 

 = Disabled

Display

Function

Default

Содержание 400

Страница 1: ...r UL325 Compliant FAAC International Inc Headquarter East Coast Operations 3160 Murrell Road Rockledge FL 32955 Tel 800 221 8278 www faacusa com FAAC International Inc West Coast Operations 357 South...

Страница 2: ...nt 8 3 FINAL OPERATIONS 8 4 SYSTEM TEST 9 5 MANUAL OPERATION 9 5 1 Restoring Normal Operating Mode 9 6 OUTWARD OPENING 9 7 POSITIVE STOP ACCESSORY 10 8 MAINTENANCE AND REPAIRS 11 8 1 Oil Level Check 1...

Страница 3: ...trians must use a separate entrance SAVE THESE INSTRUCTIONS IMPORTANT SAFETY INFORMATION Important Safety Instructions Gate Construction Vehicular gates should be constructed and installed in accordan...

Страница 4: ...I A vehicular gate operator system intended for use in a single family dwelling garage or associated parking area UL325 Gate Operator Classifications COMMERCIAL GENERAL ACCESS VEHICULAR GATE OPERATOR...

Страница 5: ...hydraulic piston which transmits drive to the gate leaf Models with hydraulic locking do not require the installation of electric locks as they provide mechanical locking of the leaf when the motor i...

Страница 6: ...condition Travel limit mechanical stops must be provided The condition of the structure directly influences the reliability and safety of the automated system The gate must swing level 2 4 INSTALLING...

Страница 7: ...m welding slag If the gate structure does not permit the bracket to be firmly fastened modify the structure to create a solid support base 10 Release the operator and manually check that the gate can...

Страница 8: ...screw red wording gate closing direction To reduce torque turn screws counter clockwise To increase torque turn screws clockwise Test the bypass adjustment by physically obstructing the gate during it...

Страница 9: ...mended Dimensions 5 MANUAL OPERATION If the gate has to be moved manually due to a power failure or a fault in the system use the release device as described below Lift the protective plug Fig 16 Ref...

Страница 10: ...43 EG The accessory is mounted on the front flange of the operator using the supplied bolts With the use of the proper square shaped swivel joint sup plied It s possible to limit the rod s travel and...

Страница 11: ...nt to not use tools or pry on this piece Now look into the body of the machine and to the left the fluid should be up to the center of the tie rod top for 400 standard or center for 400 EG when the pi...

Страница 12: ...per 29 3204425 1 Lt Lobe Pump Part Part Number Description 30 706152 Pump Pin 4x28mm 31 7090010015 O Ring 32 3060 Washer Swivel 33 2069 Swivel Jam Nut 10mm 34 7073095 Swivel Joint square 35 7220355 Fr...

Страница 13: ...12 7091015 Piston Rod Seals 13 4350105 Piston Rod Assembly 13a 4350115 Piston Rod Assembly EG Part Part Number Description 14 4994625 Front Flange 15 701829 Front Flange Bolt M5 x 20 mm 16 63000315 Se...

Страница 14: ...6 7090290015 O Ring Lock Cylinder 07 7275285 Top Cover 08 7131005 Key Viro 09 7275275 Cover Key 10 7090855 O Ring Extension Receptacle 11 722795 Extension Receptacle 12 7090865 O Ring Base to Body 13...

Страница 15: ...01 7171485 Rear Flange 02 417010 Wiring Harness 03 63001005 Cable With Molded Connector 04 7090895 O Ring 21x2 mm 05 7110015 Oil Plug 06 7109135 Cable Strain Relief 07 701479 Screw 3 x 12mm 08 701466...

Страница 16: ...le from 0 to 4 min Opening Leaf Delay 2 s can be excluded Thrust Force Adjustable on 50 levels for each motor Terminal Board Inputs Open Open Free Leaf Stop Limit switch Opening Safety Devi ces Closin...

Страница 17: ...ragraph on how to connect a monitored device If this input is active when the gate is open it will prevent the leaf closing movement OP FSW Opening safety devices contact N C The opening safety input...

Страница 18: ...24V TX FSW 20 21 W L LOCK TX FSW TX FSW 9 10 11 12 13 14 15 16 17 18 19 OPEN A B STP CL OP FSW 24V TX FSW 20 21 W L LOCK 1 2 5 4 3 1 2 RX CL TX CL TX FSW Figure I Connection of One Pair of Monitored...

Страница 19: ...ls work in combination with other monitored photocell pro tecting closing or opening entrapment zones In that case they can t be monitored so they can only protect against potential impact on vehicles...

Страница 20: ...he key the unit will display the param eter s current value Value can be modified with keys and Press and hold F again the unit will display the name of the next function parameter When you reach the...

Страница 21: ...ctions as a standardindicator light lightedatopeningand pause flashing at closing and off when gate is closed Differentfigurescorrespondtotheextra time compared to normal work time opening or closing...

Страница 22: ...cessary Note For hydraulic operators like the 400 force should be programmed to maximum level 50 8 Stop leaf movement with a STOP command 9 Release the operators close the leaves and re lock the opera...

Страница 23: ...s at closing and leaf 1 begins its closing movement 7 Slow down at closing of leaf 1 8 Leaf 1 stops at closing When the display stops flashing press push button F to exit and save the programming The...

Страница 24: ...i t n o c e s a e l e r n o d n a s k c o L g n i n e p o D E K C O L 3 f a e l e h t s e s o l C t c e f f e o N d e l b a s i d N E P O t c e f f e o N t c e f f e o N d e l b a s i d N E P O E c i...

Страница 25: ...ediately stops operation NB Effects on other active pulse inputs in brackets P A c i g o L S E S L U P S U T A T S E T A G A N E P O B N E P O P O T S S E C I V E D Y T E F A S G N I N E P O S E C I V...

Страница 26: ...TOR 1 MOTOR 2 CL COM OP 1 2 3 4 5 6 7 8 20 21 FCA1 FCA2 FCC2 FCC1 F J2 J6 J4 J5 J3 N L MAIN OP CL 24 V FSW B STOP A TX FSW 9 10 11 12 13 14 15 16 17 18 19 J1 PHOTO OP OPEN DEVICES PHOTO CL 24VDC RX PH...

Страница 27: ...O a b a b PHOTO OP a b a b OPEN SAFETY MONITORED CLOSE SAFETY MONITORED PHOTO CL Monitored safety connections The prewired enclosure comes with dedicated terminal blocks for the connection of safety p...

Страница 28: ...wired enclosure comes with dedicated terminal blocks for the connection of a relay to drive a Maglock The Maglock kit can be ordered separately as an accessory Refer to this schematic for the connecti...

Страница 29: ...1 2 5 Shadow Loop kit option The prewired enclosure comes with dedicated terminal blocks for the connection of a relay and a loop detector socket to implement the shadow loop functionality The Shadow...

Страница 30: ...en subject to misuse negligence or accident or has not been oper ated in accordance with FAAC International Inc s or FAAC S p A s instructions or has been operated under conditions more severe than or...

Отзывы: