background image

7

ENGLISH

ENGLISH

EC MACHINE DIRECTIVE COMPLIANCE DECLARATION

(DIRECTIVE 89/392 EEC, APPENDIX II, PART B)

Manufacturer:

FAAC S.p.A.

Address:

Via Benini, 1
40069 - Zola Predosa
BOLOGNA - ITALY

Hereby declares that:

  the model 400 automation system

• is intended to be incorporated into machinery, or to be assembled with other

machinery to constitute machinery in compliance with the requirements of
Directive 89/392 EEC, and subsequent amendments 91/368 EEC, 93/44 EEC
and 93/68 EEC;

• complies with the essential safety requirements in the following EEC Directives:

73/23 EEC and subsequent amendment 93/68 EEC.
89/336 EEC and subsequent amendments 92/31 EEC and 93/68 EEC.

and furthermore declares that unit must not be put into service until the
machinery into which it is incorporated or of which it is a component has been
identified and declared to be in conformity with the provisions of Directive 89/
392 EEC and subsequent amendments enacted by the national implementing
legislation.

Bologna, 1 January 1997

Managing
Director

A. Bassi

Содержание 400 CBAC lungo

Страница 1: ...C ERME T A Z I E N D A C E R TIF I C A T A UNI EN ISO 9001 085 400 400...

Страница 2: ...al d a la presente publicaci n todas las modificaciones que considere oportunas para el perfeccionamiento t cnico o para cualquier otro tipo de exigencia de car cter constructivo o comercial FAAC S p...

Страница 3: ...e 89 392 EEC and subsequent amendments 91 368 EEC 93 44 EEC and 93 68 EEC complieswiththeessentialsafetyrequirementsinthefollowingEECDirectives 73 23 EEC and subsequent amendment 93 68 EEC 89 336 EEC...

Страница 4: ...on the supply line to the automation with a contact opening distance of 3 mm or more We recommend the use of a 6A thermal magnetic circuit breaker with multi pole switching 13 Ensure that a residual...

Страница 5: ...n IP 55 Max thrust traction force daN 620 620 620 775 465 465 465 Rod stroke mm 260 260 260 260 260 380 380 Rod speed cm s 1 1 1 0 75 1 5 1 5 1 5 Operator weight Kg 8 6 8 6 8 6 8 6 8 6 10 10 Duty cycl...

Страница 6: ...e nut provided 4 Release the operator see paragraph 5 5 Extend the rod to the end of its stroke and then retract it by Table 2 INSTALLATIONDIMENSIONS about 5 mm Fig 5 6 Lock the operator see paragraph...

Страница 7: ...sheath 3 Fig 11 13 Repeattheaboveoperationstoinstallthesecondoperator 14 Maketheelectricalconnectionsoftheelectroniccontrolunit followingtheinstructionsprovided 4 START UP Fig 7 Fig 7 Fig 9 4 1 ANTI...

Страница 8: ...tion on the side of the operator Fig 12 Carefullycheckoperationoftheoperatorandalltheconnected accessories especiallythesafetydevices Give thecustomerthe Userguide anddemonstratehowtouse the operator...

Страница 9: ...tted with one or more electric locks to ensure mechanical locking of the gate leaves The FAAC 400 can automate gate leaves up to 7 m in length depending on the model The operators are controlled by an...

Отзывы: