eyePower PDU User Manual V1.0.docx
Page 6 of 6
Note that eyePower Limited do not recommend operation of the current eyePower PDU in this manner and take no
responsibility if the switch between two non-sync supplies causes any damage to connected equipment or causes
one or both supply breakers to trip.
A future release of firmware will allow for non-sync switch back to the ‘A’ supply. When the ‘A’ supply returns, the
unit will wait a further minute for the opportunity to make a sync change, even if the supplies are "running through"
at different frequencies. After the further delay, non-sync changeover to preference is enforced with a gap created
in the supplies. This carries certain risks, to greatly minimise the change of arcing between supplies all input and
output relays are briefly opened hence a total of nineteen relays operate at the same time.
Notes:
THIS UNIT MUST BE EARTHED. THIS UNIT IS DESIGNED FOR EUROPEAN STANDARD TYPE TN MAINS WITH
NEUTRAL NEAR TO SAME POTENTIAL AS EARTH. 220V/240V NOMINAL.
INLETS ARE 16A AND ALL INTERNAL WIRING IS RATED FOR 20A MAXIMUM, UPSTREAM SUPPLY MUST BE FITTED
WITH FUSE/BREAKER NO GREATER THAN 16A.
OUTLET FUSES ARE 3.15A AS SHIPPED, OFFERING REASONABLE DISCRIMINATION AGAINST UPSTREAM SUPPLY
FUSING AND HIGH ENOUGH CURRENT RATING FOR MOST TYPICAL LOADS. USERS CAN UPRATE OUTLET FUSES TO
10A MAXIMUM, HIGH RUPTURE CURRENT (HRC) 20mm CERAMIC.
GLASS FUSES SHOULD NOT BE USED
.
For more information and software relating to eyePower PDU, including how to perform an Electrical Safety Test
(PAT test), please visit
https://www.eyepowerlimited.co.uk/eyepower-support
.