6.  Irradiation Intensity Control 

The system irradiation intensity was set to an average 1000W/m

2

 (+/-15%; class C 

uniformity) at the time of installation. This intensity distribution test is included in Section 3 of 
this manual. We recommend that the irradiation intensity is verified approximately every 500 
hours of operation or once per month. To adjust the irradiation intensity, please follow the 
steps below. 

a)  Refer to initial installation irradiation intensity distribution diagram included in Section 

3 of this manual. 

b)  Select at least two (2) distributed test locations from distribution grid (these positions 

are marked by tape on the bottom of the chamber roller shelf). 

c)  Turn on full solar array and allow at least ten (10) minutes for the lamps to stabilize.   
d)  Place a full spectrum pyranometer on the first of these selected positions and 

measure irradiation intensity, then repeat at the second selected position. 

e)  Compare these measurements against the initial installation irradiation intensity 

measurements, if the difference is more than five (5) percent it is recommended that 
a full 18 point irradiation intensity grid measurement is performed. This will provide 
the minimum irradiation intensity point and allow the calculation of the average 
irradiation intensity and full target uniformity. 

f)  If the minimum irradiation intensity is below 850W/m

2

 the irradiation intensity power 

should be adjusted using the DIMMING CONTROL calibrated dial. This circuit 
outputs a 0-10V signal that controls the power output (0V = Max power; 10V = Min 
power). A typical value for a new installation (set to 1000W/m

2

) will be approximately 

4.2V.   

g)  Place the pyranometer at the minimum measured irradiation intensity grid point and 

ensure the reading is stable. Adjust the controller voltage lower while reading the 
intensity level from the pyranometer (allow sufficient time after any adjustment for 
the intensity level to stabilize). 

h)  Adjust the power such that the intensity level is increased to a value between 900-

950W/m

2

.   

i)  Re-measure the full 18 point grid irradiation intensity and re-calculate the Max, Min, 

and Average values to ensure they are within specification. 

 

If, for a particular application, you desire to reduce the average irradiation intensity to a value 
lower than 1000W/m2 (such as 850W/m2), please follow steps g) – i) above and adjust the 
power output proportionally to the desired average irradiation intensity level. 
 
NOTE: To ensure solar lamp irradiation and spectrum stability, the average irradiation 
intensity (power output) should not be reduced below 800W/m

2

 

 

Содержание Iwasaki Electric ESS0460-H119

Страница 1: ...F08 064 Operating Manual ESS0460 H119 PV Module Solar Soaking Chamber 12 19 2008...

Страница 2: ...tional Iwasaki Electric 9150 Hendricks Road Mentor OH 44060 888 665 2677 support eyeappliedoptics com In order to operate this system properly and prevent potential problems please read the following...

Страница 3: ...r Breaker 3 phase main power switch for system Solar Light Chamber Shields roll down curtains to shield excess light from work area Solar Irradiation Chamber Cooling Air Ducts dual axial blowers direc...

Страница 4: ...nection 3 4 wire RED WHITE BLACK power phase connections and GREEN ground connection single phase solar lamp circuits are equally divided to balance the power over all three phases To protect against...

Страница 5: ...rate meter is assigned to each zone and records the cumulative operation hours for the lamps in that zone Recording the lamp operating time is extremely beneficial for preventative maintenance If less...

Страница 6: ...alarm buzzer will sound Cause of failure could be the lamp inverter starter or wiring defect Solar lamps will shut down but fan will continue for 10 minutes COOLING FAN SWITCH This switch initiates th...

Страница 7: ...ow ten 10 minutes for solar lamps to reach full power and spectrum stabilization To ensure minimum IEC class C uniformity over entire target irradiation area please observe the following guidelines Fo...

Страница 8: ...m irradiation intensity point and allow the calculation of the average irradiation intensity and full target uniformity f If the minimum irradiation intensity is below 850W m2 the irradiation intensit...

Страница 9: ...continuously measured by a type K thermocouple located near the top of the chamber Check the chamber temperature reading at the control panel to ensure an overheat condition does not exist If the temp...

Отзывы: