Overview

The Extron NBP 1200C is a furniture-mountable Cable Cubby

®

 enclosure with a Network Button Panel integrated into the lid. It 

is a fully customizable AV system control interface for use with Extron IPCP Pro Series and IPL Pro Series Control Processors, 
and with Extron meeting space collaboration system products. Each NBP button panel has a single LAN port, which supports 
both power and communications between the IPCP Pro control processor and the button panel. The flip-up button panel has ten 
customizable, soft-touch buttons that are backlit for easy operation in low-light environments.
Use Extron Toolbelt software to discover and manage NBP button panels and assign each one a unique IP address. Then use 
Extron Global Configurator

®

 (GC) Plus and Professional software, or Global Scripter

®

 programming to configure the control 

system, including the buttons on NBPs. Once configured, the AV system can be controlled from any of the NBPs.
This guide provides basic installation instructions. For more details on the entire line of NBPs, see the 

Network Button Panels 

User Guide

, available on 

www.extron.com

. For details on configuration, see the software help files.

Installation

Installation includes the following steps:

Step 1: Get Ready

Step 2: Prepare the Installation Site, Cut the Table or
Furniture

Step 3: Assemble AAP, Pass-through, and Power Modules

Step 4: Install Modules and a Retractor Bracket

Step 5: Change Buttons (optional)

Step 6: Mount the NBP 1200C to the Table

Step 7: Install Retractors

Step 8: Install Cables in the Cable Cubby

Step 9: Cable the NBP 1200C and Other Devices in the
System

Step 10: Set up the NBP for Network Communication

Step 11: Configure the System

Step 12: Test and Troubleshoot

Step 1: Get Ready

Preparation checklist

Use the following checklist to prepare for the installation.

 

…

Download and install the latest versions of the software, firmware, and device drivers needed to configure or program the 
control processor or HCR receiver to interact with the NBPs and control the connected AV products. See the 

IPCP Pro Series 

User Guide, IPL Pro Series User Guide

, or 

HC 400 Series User Guide

 (available at 

www.extron.com

) for details on software 

and drivers.

 

…

Obtain network information for the unit from the network administrator. You need the following details for each IP Link Pro 
device, including the IPCP Pro and each NBP:

 

…

DHCP setting (on or off)

 

…

Subnet mask

 

…

User name

 

…

Device (NBP) IP address

 

…

Gateway IP address

 

…

Passwords

NOTE:

  If DHCP is on, you do not need the IP addresses and subnet mask.

 

…

Write down the MAC address of each IP Link Pro device (such as the NBP) to be used.

 

…

Obtain model names and setup information for the AV devices to be controlled in the system.

 

…

Each NBP button panel comes with a factory-installed Secure Sockets Layer (SSL) security certificate. If you intend to install 
a different SSL certificate, contact your IT department to obtain the certificate or for instructions on how to obtain one. See 
“Secure Sockets Layer (SSL) Certificates” in the 

Network Button Panels User Guide

 for requirements and guidelines regarding 

SSL certificates.

 

…

Verify that you have all the included parts (see 

Included parts

 on the next page) and have all the necessary tools for installing 

the Cable Cubby. 

 

…

Before cutting a hole in any furniture, select the best location for the NBP 1200C.

Ensure that the product is oriented so that the lid opens in the desired direction.

Ensure there is enough space for all the system cables and components, including cable retractors, if they are to be
installed.

 

…

Check all relevant regulations.

Содержание NBP 1200C

Страница 1: ...NBP 1200C and Other Devices in the System Step 10 Set up the NBP for Network Communication Step 11 Configure the System Step 12 Test and Troubleshoot Step 1 Get Ready Preparation checklist Use the fol...

Страница 2: ...ingle connectivity bracket is provided It can be used with either the AAP frame plate or the cable grommet plate Step 2 Prepare the Installation Site Cut the Table or Furniture ATTENTION Installation...

Страница 3: ...r acc der au connecteurs est soulign voir CNC Wood Router ci dessous Extron ne sera pas responsable des erreurs de coupe Ensure the table surface is at least 0 50 inch 1 27 cm thick Assurez vous que l...

Страница 4: ...e accommodates up to three single space AAPs Assembly procedures are shown in figure 2 at right Cable pass through module The cable pass through module accommodates up to eight AV cables Assemble the...

Страница 5: ...cable pass through module and power module Insert the modules into the cable cubby as shown in figure 5 NOTES Extron recommends mounting the power module on the left side of the enclosure For any cabl...

Страница 6: ...rd The panel is attached to the lid with a hinge that allows access to the buttons without the panel becoming completely detatched You can now return the lid to the fully open position 5 5 From the fr...

Страница 7: ...st the enclosure Lower the Cable Cubby into the hole to test the fit If necessary carefully enlarge the opening plastic m on f the e e ON OFF PC LA PTO P MUTE MED IA PL AY ER HDMI 1 HDMI 2 2 1 3 Figur...

Страница 8: ...2 3 1 4 Figure 9 Installing Retractors Step 8 Install Cables in the Cable Cubby e ON OFF PC LAPTOP MUTE MED IA PL AY ER HDMI 1 HDMI 2 For cable pass through applications allow at least 36 inches 0 9...

Страница 9: ...plex level autodetected Data rates 10 100Base T Power over Ethernet PoE The NBP receives power at this port Default login credentials Username admin Initial password unit serial number Password after...

Страница 10: ...for the control device NOTE See the Toolbelt Help File Global Configurator Help File and Global Scripter Help File as needed for step by step instructions and detailed information The help file for GC...

Страница 11: ...Volume LEDs Volume LEDs light to act as a meter to indicate the volume level NOTE There is no item F for this NBP model G Cable Cubby lid The lid tilts back to 130 Friction washers ensure the lid hold...

Страница 12: ...ettings to factory default values without affecting user loaded files Reset to Factory Defaults Press and hold the Reset button for 9 seconds After the Reset LED blinks three times release and momenta...

Страница 13: ...13 This page is intentionally left blank...

Страница 14: ...st the system make adjustments finalize configuration Save the project Cable the NBPs and the control processor or HCR receiver then apply power Cable all devices Prepare the installation site Get rea...

Отзывы: