FPC Installation and Operation, cont’d
FPC 5000 Front Panel Controller
•
FPC Installation and Operation
2-8
Cabling and RJ-45 connector wiring
It is vital that your cable between the FPC 5000 and the Matrix 12800 BME 0 or
LAN be the correct cable, and that it be properly terminated with the correct
pinout. This FPC link requires CAT 5e or CAT 6, unshielded twisted pair (UTP) or
shielded twisted pair (STP) cables, terminated with RJ-45 connectors. The cable
length is limited to 328’ (100 m).
Do not use standard telephone cables. Telephone cables will not support the
FPC-Matrix 12800 link.
Do not stretch or bend cables. Transmission errors can occur.
The cable must be properly terminated for your application (figure 2-9):
•
Crossover cable
— Direct connection between the FPC and BME 0.
•
Patch (straight) cable
— Connection of the FPC to an Ethernet LAN that also
hosts BME 0.
Clip Down
Side
1
1&2
3&6 4&5
7&8
2 3 4 5 6 7 8
1
Pins
2 3 4 5 6 7 8
RJ-45
connector
Patch (straight) cable
Twisted
Pairs
Side 1
Side 2
Pin
Wire color
Pin
Wire color
1
White-orange
1
White-orange
2
Orange
2
Orange
3
White-green
3
White-green
4
Blue
4
Blue
5
White-blue
5
White-blue
6
Green
6
Green
7
White-brown
7
White-brown
8
Brown
8
Brown
Crossover cable
Side 1
Side 2
Pin
Wire color
Pin
Wire color
1
White-orange
1
White-green
2
Orange
2
Green
3
White-green
3
White-orange
4
Blue
4
Blue
5
White-blue
5
White-blue
6
Green
6
Orange
7
White-brown
7
White-brown
8
Brown
8
Brown
Figure 2-9 — RJ-45 connector pinout tables
Содержание FPC 5000
Страница 1: ...FPC 5000 Matrix 12800 Switcher Front Panel Controller 68 556 05 Rev A Printed in the USA 05 03...
Страница 20: ...FPC Installation and Operation cont d FPC 5000 Front Panel Controller FPC Installation and Operation 2 12...
Страница 58: ...Matrix 12800 Operation cont d FPC 5000 Front Panel Controller Matrix 12800 Operation 3 38...