background image

 

68-2491-50   

Rev. B

05 14

6

Extron Headquarters

+800.633.9876 Inside USA/Canada Only

 
Extron USA - West 

Extron USA - East

+1.714.491.1500 +1.919.850.1000
+1.714.491.1517 FAX 

+1.919.850.1001 FAX

Extron Europe

+800.3987.6673
Inside Europe Only

+31.33.453.4040
+31.33.453.4050 FAX

Extron Asia

+65.6383.4400
+65.6383.4664 FAX

Extron Japan

+81.3.3511.7655
+81.3.3511.7656 FAX

Extron China

+86.21.3760.1568
+86.21.3760.1566 FAX

Extron Middle East

+971.4.299.1800
+971.4.299.1880 FAX

Extron Korea

+82.2.3444.1571
+82.2.3444.1575 FAX

Extron India

1800.3070.3777
(Inside India Only)

+91.80.3055.3777
+91.80.3055.3737  FAX  

© 

2014 Extron Electronics   All rights reserved.  All trademarks mentioned are the property of their respective owners. 

 

www.extron.com

Installation Checklist

Planning (page 1)

 

†

Check with local and state regulations before starting the installation.

 

†

Check all parts and equipment before installation.

Preparing the Table (page 2)

 

†

Determine the best location for the enclosure.

 

†

Choose a method for cutting the hole in the table.

Preparing the Cable Cubby (page 3)

 

†

Choose and assemble a combination of AAPs, cable-pass through, and retractor connectivity to populate  
the Cable Cubby.

 

†

Secure the connectivity modules and power module in the Cable Cubby.

Mounting the Cable Cubby in the Table (page 4)

 

†

Mount the Cable Cubby flush with the table.

 

†

Adjust the side clamps.

Installing Retractors (page 5)
Routing and Connecting Cables (page 6)

Routing and Connecting Cables

CAUTION:

   

Risk of Electric Shock

.  

This equipment must be grounded.

ATTENTION:

   

Risque de choc électrique

.  

Cet équipement doit être fixé au sol.

NOTE:

 

Ensure that there is no tension on the power cable. 

Secure cables with zip ties to the rectangular

holes in the rear of the Cable Cubby.

For cable pass-through applications, allow at least 36 inches (0.9 m) 

of cable loop for each cable.

Connect cables to the AV system 

and connect the AC power cord.

2

1

3

Содержание Cable Cubby 500

Страница 1: ...er Module 125 V 12A MA X TO TA L Retractor Trim and Screws Retractor Pin Clip 6 Mounting Screws and Star Washers 4 40 Module Screws i i B k 3 3 8 1 1 4 6 3 8 2 1 4 Hole Plugs Connectivity Bracket Cable Grommet Plate AAP Frame Plate Cable Cubby 500 Cable Cubby 700 Zip Ties Tweeker AC Power Module 125 V 12A MA X TO TA L Retractor Trim and Screws Retractor Pin Clip 6 Mounting Screws and Star Washers ...

Страница 2: ...uire à une blessure à l oeil Choose one of the following methods for cutting the hole Hand Router and Routing Template Jigsaw and Paper Cut Out Template CNC Wood Router If using a CNC wood router or other precise machinery use the exact cut out dimensions for your model see the table below Visit www extron com for Cable Cubby routing template part numbers and instructions Dimensions and cut out te...

Страница 3: ...by with a combination of AAPs cable pass through or retractors NOTE After assembling the module proceed to Step 2 Install the modules on the next page NOTE After assembling the module proceed to Step 2 Install the modules on the next page Secure up to two single space AAPs in the AAP plate 4 40 Nut w Captive Washer Insert cables through the bottom of the connectivity bracket Connect cables to the ...

Страница 4: ...ser Mounting the Cable Cubby in the Table Step 2 Install the modules Determine where the connectivity modules and power module will be installed in the Cable Cubby The modules may be installed on the left or right side of the enclosure and at various heights NOTE Ensure that there is enough room above the modules for the Cable Cubby lid to close completely Use a screwdriver to secure the modules w...

Страница 5: ...m Secure the clip on the pin Insert retractors into the retractor trim Secure the locking screw on each retractor Do not overtighten Insert the pin through the retractor mounting hole on the side of the Cable Cubby and retractor assembly 1 2 3 4 For horizontal or angular mounting remove these orientation screws front and back then follow the steps shown at left Rotate the side clamp outward and en...

Страница 6: ...ll parts and equipment before installation Preparing the Table page 2 Determine the best location for the enclosure Choose a method for cutting the hole in the table Preparing the Cable Cubby page 3 Choose and assemble a combination of AAPs cable pass through and retractor connectivity to populate the Cable Cubby Secure the connectivity modules and power module in the Cable Cubby Mounting the Cabl...

Отзывы: