Chapter 5: Installing the Virtual Services
Platform 7200 Series
This section provides the information and procedures to install the VSP 7200 Series.
Installation checklist
Use this checklist to install the VSP 7200 Series.
No.
Task
Description
1.
Mount the VSP 7200 Series in the
equipment rack.
Installing the switch in an equipment
on page 40.
You have two options for installing the switch in
an equipment rack:
•
Using the optional slide rack mount kit
on
page 41
•
2.
Install the primary or redundant
power supply.
Important:
A combination of AC-input and
DC-input power supplies in the
same chassis is not supported.
If you have an AC power supply, see
on page 24.
If you have a DC power supply, see
on page 29.
3.
Install the fan modules.
4.
Check the LEDs to verify the
installation.
For a description of the LEDs, see
on page 37.