background image

Required Cable

Description

Note:

100BASE-FX Transceivers are supported in SFP ports only, and
not in SFP+ ports.

Console Port

Varies depending on the user device. The VSP 4000 has an RJ45
female connector, so a serial cable with RJ45 connectors, or a serial
cable with a DB-9 female connector on one end and an RJ45 on the
other is appropriate. The maximum length for the console port cable
is 25 feet (8.3 meters).

SFP Transceiver Ports

Varies with the installed SFP transceiver. See the documentation
shipped with the SFP transceiver for specifications.

USB Port

The USB port is usable with a USB drive for file transfer of config
files, log files and software images.

Installation and removal of Small Form Factor Pluggable
(SFP) transceivers

The following section describes how to install and remove Small Form Factor Pluggable (SFP)

transceivers in the Virtual Services Platform 4000 Series switches. For more information about SFP

transceiver use and designation, see 

Installing Transceivers and Optical Components on VSP

Operating System Software

.

Installing SFP transceivers

Install SFP transceivers by performing this procedure.

1. Remove the transceiver from the protective packaging.
2. Verify that the transceiver is the correct model for the network configuration.
3. Grasp the transceiver between your thumb and forefinger.
4. Insert the transceiver into the proper module on the switch. Apply a light pressure to the

transceiver until it clicks and locks into position in the module.

5. Remove the dust cover from the transceiver optical bores.

Removing SFP transceivers

Remove SFP transceivers by performing this procedure.

1. Disconnect the network fiber cable from the transceiver.
2. Use the locking mechanism on the transceiver to release it. The locking mechanism varies

from model to model as illustrated below.

Installation and removal of Small Form Factor Pluggable (SFP) transceivers

August 2018

Installing Virtual Services Platform 4850GTS Series

27

Содержание EC4800078-E6

Страница 1: ...Installing Virtual Services Platform 4850GTS Series 9035363 Rev 02 August 2018...

Страница 2: ...HE TERMS OF USE IF YOU ARE ACCEPTING THE TERMS OF USE ON BEHALF A COMPANY OR OTHER LEGAL ENTITY YOU REPRESENT THAT YOU HAVE THE AUTHORITY TO BIND SUCH ENTITY TO THESE TERMS OF USE IF YOU DO NOT HAVE S...

Страница 3: ...ER IS HOSTING ANY PRODUCTS THAT USE OR EMBED THE G 729 CODEC H 264 CODEC OR H 265 CODEC THE EXTREME NETWORKS CHANNEL PARTNER ACKNOWLEDGES AND AGREES THE EXTREME NETWORKS CHANNEL PARTNER IS RESPONSIBLE...

Страница 4: ...Preventing electrostatic damage in new cable installations 20 Technical specifications 20 Environmental requirements 21 Airflow direction 22 Package contents 22 Installing the Virtual Services Platfo...

Страница 5: ...efinitions 36 Front panel LEDs 36 Switch LED state indicators 38 Port LED state indicators 39 Viewing hardware information 40 Chapter 6 Translations of safety messages 43 Contents August 2018 Installi...

Страница 6: ...for improvements to our documentation so you can find the information you need faster Broken links or usability issues If you would like to provide feedback to the Extreme Networks Information Develo...

Страница 7: ...tion of your network environment such as layout cable type other relevant environmental information Network load at the time of trouble if known The device history for example if you have returned the...

Страница 8: ...Type your first and last name 3 Type the name of your company 4 Type your email address 5 Type your job title 6 Select the industry in which your company operates 7 Confirm your geographic information...

Страница 9: ...er 2 New in this document There are no feature related changes for this release in Installing the Virtual Services Platform 4850GTS Series August 2018 Installing Virtual Services Platform 4850GTS Seri...

Страница 10: ...00 Mbps 802 3at PoE 2 Combo 100 1000 Mbps SFP ports 2 1 10 Gbps SFP ports Base Software License one of two field replaceable 1000W PSUs supplied with the chassis EC4800A88 E6 VSP 4850GTS DC 48 10 100...

Страница 11: ...be ordered separately Ensure you order the correct power cord for your region For more information see Power cord types and order codes on page 11 Table 2 Power supply order codes VSP 4000 PSU Usage P...

Страница 12: ...20105 E6 Power cord 2 5 m IEC C15 to CEI 23 16 Italy AA0020106 E6 Power cord 2 5 m IEC C15 to SI 32 Israel AA0020108 E6 Power cord 2 5M IEC C15 TO NEMA L6 15P Twist Lock USA and Canada AA0020109 E6 Po...

Страница 13: ...ll bring up the port operationally when using non Extreme Networks SFP or SFP transceivers Extreme Networks does not provide support for operational issues related to these transceivers but they will...

Страница 14: ...for VSP 4850GTS Series on page 10 for part numbers 3 Make sure that you have the following tools and cables Phillips 2 screwdriver RJ45 console port cable ESD cable See Cable requirements for the Virt...

Страница 15: ...to the same grounding electrode used by the power service in the area The ground path must be permanent and must not exceed 1 Ohm of resistance from the rack to the grounding electrode August 2018 In...

Страница 16: ...rtant Extreme Networksdoes not support a combination of AC input and DC input power supplies in the same chassis For the procedure to install the power supply see Installing the Virtual Services Platf...

Страница 17: ...th the copper and fiber ports Two 1 10 Gbps SFP ports Figure 1 VSP 4850GTS 1 VSP 4000 USB device with USB device cover Caution To ensure proper operation the USB FLASH drive must remain inserted in al...

Страница 18: ...10 Gbps SFP slots Supports Extreme Networks 1 Gbps SFPs and 10 Gbps SFP s 6 Console port Converting ERS 4850 to VSP 4000 This section lists information on Extreme Networks switch conversion supported...

Страница 19: ...and procedures to prevent electrostatic discharge during installation Preventing electrostatic discharge damage Electrostatic discharge ESD is a discharge of stored static electricity that can damage...

Страница 20: ...the ESD discharge cable perform this procedure 1 Connect the ground lug on the ESD discharge cable to a safe and suitable earth ground 2 Connect all RJ45 cable connectors to the female RJ45 connector...

Страница 21: ...Virtual Services Platform 4000 environmental requirements Environmental requirement Virtual Services Platform 4000 models Operating Temperature 0 C to 50 C 32 F to 122 F Storage Temperature 40 C to 8...

Страница 22: ...from the front Cool air enters the chassis through an air inlet at the left of the chassis which cools the device Warm air exits through the exhaust at the right Package contents The following descri...

Страница 23: ...op of an VSP 4000 The switch housing of an VSP 4000 cannot support the weight of these units For a translation of this statement see Translations of safety messages on page 43 1 Remove the screws that...

Страница 24: ...ation and at least 5 inches 12 7 centimeters at the back for power cord clearance Installing the Virtual Services Platform 4000 in an equipment rack To install an VSP 4000 switch in an equipment rack...

Страница 25: ...le units For a translation of this statement see Translations of safety messages on page 43 1 Remove the screws that hold the USB cover but do not remove the USB cover Caution To ensure proper operati...

Страница 26: ...d ANSI TIA EIA 568 B fitted with an RJ45 Module jack 10 100BASE TX Ports The interconnect cabling for 10BASE T Ethernet must conform to Cat3 Cat4 Cat5 or better UTP cabling for distances up to 100 met...

Страница 27: ...00 Series switches For more information about SFP transceiver use and designation see Installing Transceivers and Optical Components on VSP Operating System Software Installing SFP transceivers Instal...

Страница 28: ...he Virtual Services Platform 4000 Series switches Connector pin assignments for VSP 4000 switches 4850GTS PWR and 4450GSX PWR The following table describes the Power over Ethernet Plus RJ45 connector...

Страница 29: ...XD 3 Receive Data RXD 4 Data terminal ready not used 5 Signal ground GND 6 Not used 7 Request to send not used 8 Not used 9 Ring indicator not used Table 10 RJ45 Console port pin assignments Connector...

Страница 30: ...tempting to insert the power supply 2 Insert each power supply into a rear power supply slot 3 Verify that each power supply is fully seated in the slot Secure the power supply with the two thumb scre...

Страница 31: ...Figure 4 300 W AC power supply Connector The 300 W and 1000 W AC power supplies use an IEC 60320 C16 AC power cord connector The AC power cord is in close proximity to the hot air exhaust and support...

Страница 32: ...rm 4000 Series 4850GTS and 4850GTS PWR switches The regulatory power specifications are based on the maximum rated capacity of the power supplies and are not based on typical power consumption which i...

Страница 33: ...rd specifications Country and Plug Specification Specifications Typical Plug Continental Europe CEE7 standard VII male plug Harmonized cord HAR marking on the outside of the cord jacket to comply with...

Страница 34: ...er outlet The following figure shows how to connect the AC power cord to the switch rear panel Important The VSP 4000 series has no AC power switch When you connect the power cord to a suitable energi...

Страница 35: ...06 000 LifeCycle INFO Stopping all processes CP1 03 24 14 18 39 08 000 LifeCycle INFO All processes have stopped CP1 03 24 14 18 39 08 000 LifeCycle INFO All applications shutdown starting power down...

Страница 36: ...ollowing sections describe the LEDs on the Virtual Services Platform 4000 Series switches The tables describe LED operation for a switch that finishes the power on self test Related links Front panel...

Страница 37: ...PoE ports LEDs above ports 4 Combo 100 1000 Mbps SFP slots Supports Extreme Networks 1 Gbps SFPs and 100 Mbps low speed SFPs 5 1 10 Gbps slots Supports Extreme Networks 1 Gbps SFPs and 10 Gbps SFP s...

Страница 38: ...itch encountered an error when running the diagnostic software Amber blinking The switch is booting and running diagnostic software Normal activity during boot process Off The switch failed the power...

Страница 39: ...link The port is set to operate at 100 Mbps with PoE Amber Steady The port is set to operate at 100 Mbps without PoE Amber Green Pulse The port is experiencing a PoE error Off When the Link Activity L...

Страница 40: ...ts 47 and 48 in VSP 4850GTS or VSP 4850GTS PWR the port Link Activity LEDs graphically represented in EDM do not reflect the correct LED status on the switch The port Link Activity LEDs in EDM remain...

Страница 41: ...er Admin Power Status Status State 1 4850GTS PWR 12JP442H70GH AL4800A88 E6 up up on Temperature Info Chassis Temperature 34 Power Supply Info Ps 1 Status UP Ps 1 Type AC Ps 1 Description AC DC 54V 100...

Страница 42: ...y s 00 02 26 Last Vlan Change 0 day s 00 02 26 Last Statistic Reset 0 day s 00 00 00 Current Uboot Info VU Boot 2012 04 00001 g6a10a19 Apr 18 2014 16 22 07 MPC83XX Variable definitions Use data in the...

Страница 43: ...e baie ne l empilez pas directement sur un autre Chaque module doit tre fix sa propre baie l aide des supports de montage appropri s Ces supports ne sont pas con us pour r sister plusieurs modules Imp...

Страница 44: ...dans une baie veillez laisser la plaque m tallique sur la baie Si vous la retirez l a ration du module ne peut pas s effectuer correctement Important Precaution Si no instala ning n m dulo en la ranur...

Страница 45: ...cc der facilement en cas d urgence Important Advertencia Para apagar el dispositivo debe desenchufar el cable Conecte siempre el cable de alimentaci n a una toma segura y de f cil acceso por si se pro...

Страница 46: ...la messa a terra Senza un adeguata messa a terra chiunque tocchi lo switch corre il rischio di ricevere una scossa elettrica L assenza di un percorso per la messa a terra verso lo switch pu comportare...

Страница 47: ...te t cnico de Extreme Networks si necesita asistencia para cambiar la bater a Important Aviso A bateria de l tio n o substitu vel em campo S deve ser removida e substitu da por pessoal autorizado Entr...

Отзывы: