Chapter 4: Preinstallation checklist
Before you install the VSP 4850GTS, VSP 4850GTS-DC, and VSP 4850GTS-PWR+, make sure
that you complete the tasks in the preinstallation checklist.
No.
Task
Description
1.
Review the technical specification for
the switch. Make sure that the area
where you install the switch and where
it will operate meet the requirements.
For the physical, electrical, and environmental
specifications, see
page 20.
2.
Verify the power supply unit (PSU)
specifications. Optionally order a
redundant PSU to provide redundancy
and load sharing.
AC power supply specifications
page 32 or
DC power supply specifications
page 32.
for part numbers.
3.
Make sure that you have the following
tools and cables:
• Phillips #2 screwdriver
• RJ45 console port cable
• ESD cable
Cable requirements for the Virtual
4.
Unpack the equipment.
Observe ESD precautions when you unpack
the equipment. See
page 19.
5.
Verify the contents of the shipped
package.
on page 22 for a
description of the components that are
provided with the switch. If any components
are missing, contact support at
www.extremenetworks.com/support
.
6.
Make sure that the power cord has the
correct country-specific termination.
7.
Prepare the rack.
Ensure that there is enough rack space to
accommodate a 2RU switch (8.8 cm).
Ensure that the rack is bolted to the floor and
braced if necessary.
Table continues…