294
Extreme Networks Consolidated "e" and "i" Series Hardware Installation Guide
BlackDiamond 6800 Series I/O Modules
Installing I/O Modules
You can insert I/O modules at any time, without causing disruption of network services. Complete the
action of inserting a BlackDiamond I/O module in a reasonable time frame. Be sure to insert the
module completely to avoid partial insertion or connection of backplane connectors.
You need the following tools and equipment to install an I/O module:
•
ESD-preventive wrist strap
•
# 1 Phillips screwdriver
•
Appropriate type of cable for the I/O module you plan to install
To install an I/O module:
1
Attach the ESD strap to your wrist and connect the metal end to the ground receptacle on the top
left corner of the switch front panel.
2
Select a slot for the module:
•
Slots numbered 1 through 16 in the BlackDiamond 6816 chassis
•
Slots numbered 1 through 8 in the BlackDiamond 6808 chassis
•
Slots numbered 1 through 4 in the BlackDiamond 6804 chassis
CAUTION
You can install I/O modules only in the numbered slots. I/O modules do not fit in slots A, B, C, or D.
Forceful insertion can damage the I/O module.
3
Remove the blank faceplate from the slot to make room for the module, if applicable.
NOTE
Any unoccupied module slot in the chassis should have a blank faceplate installed to ensure
satisfactory protection from EMI and to guarantee adequate airflow through the chassis.
4
Hold the module by its front panel with one hand, and place your other hand under the edge of the
metal panel to support the weight of the module. Check the connectors for dust and packing
materials.
Table 62:
BlackDiamond ARM and MPLS module LEDs
LED
Color
Indicates
Status
Flashing green
Flashing amber
Off
Normal operation
Configuration error, code version error, diagnostic failure, or other
severe module error
No power
DIAG
Green
Flashing amber
Amber
Normal operation
Diagnostics in progress
Diagnostic failure
Содержание e" series
Страница 18: ...18 Extreme Networks Consolidated e and i Series Hardware Installation Guide Preface...
Страница 19: ...Part 1 Common Features...
Страница 20: ......
Страница 25: ...Part 2 Site Planning...
Страница 26: ......
Страница 56: ...56 Extreme Networks Consolidated e and i Series Hardware Installation Guide Site Preparation...
Страница 57: ...Part 3 Summit Switch...
Страница 58: ......
Страница 106: ...106 Extreme Networks Consolidated e and i Series Hardware Installation Guide Summit Switch Models...
Страница 116: ...116 Extreme Networks Consolidated e and i Series Hardware Installation Guide Summit Switch Installation...
Страница 137: ...Part 4 Alpine Switch...
Страница 138: ......
Страница 180: ...180 Extreme Networks Consolidated e and i Series Hardware Installation Guide Alpine 3800 Series Switch Management Module...
Страница 208: ...208 Extreme Networks Consolidated e and i Series Hardware Installation Guide Alpine 3800 Series I O Modules...
Страница 213: ...Part 5 BlackDiamond Switch...
Страница 214: ......
Страница 232: ...232 Extreme Networks Consolidated e and i Series Hardware Installation Guide BlackDiamond 6800 Series Switch Overview...
Страница 303: ...Part 6 Switch Operation...
Страница 304: ......
Страница 307: ...Part 7 Appendixes...
Страница 308: ......
Страница 314: ...314 Extreme Networks Consolidated e and i Series Hardware Installation Guide Safety Information...
Страница 376: ...376 Extreme Networks Consolidated e and i Series Hardware Installation Guide Installing GBICs and Mini GBICs...