126
Extreme Networks Consolidated "e" and "i" Series Hardware Installation Guide
Installing and Connecting Summit Power Supplies
Figure 64:
Redundant Power Cable with Key
Figure 65:
Redundant Power Connection
8
Connect the other end of each EPS-160 power supply cable to the Extreme switch. This connector
end can only be inserted into the switch with the end marked TOP facing up.
9
Connect the supplied AC cable to the AC supply for each unit.
For countries other than the USA, you might require a different AC cable that is not supplied.
Contact your sales representative for the appropriate cable type and for information regarding the
voltage and current requirements of the power supply.
Adding a Second EPS-160 to the EPS-T
To install an individual EPS-160 in the EPS-T:
1
Remove the EPS-160 from the packing material.
2
Insert the EPS-160 into the front of the EPS-T.
3
Tighten the provided thumbscrews to secure the power supply to the tray.
4
Follows steps 7 through 9 on page 125.
Removing an EPS-160 from the EPS-T
To remove an EPS-160 from an EPS-T:
1
Disconnect the AC by removing the plug from the wall
2
Disconnect the AC power cord from the EPS-160.
ES4K027
ES4K021A
To AC
Slot for plug
Redundant
power cable
Keyed end of
redundant power cable
Содержание e" series
Страница 18: ...18 Extreme Networks Consolidated e and i Series Hardware Installation Guide Preface...
Страница 19: ...Part 1 Common Features...
Страница 20: ......
Страница 25: ...Part 2 Site Planning...
Страница 26: ......
Страница 56: ...56 Extreme Networks Consolidated e and i Series Hardware Installation Guide Site Preparation...
Страница 57: ...Part 3 Summit Switch...
Страница 58: ......
Страница 106: ...106 Extreme Networks Consolidated e and i Series Hardware Installation Guide Summit Switch Models...
Страница 116: ...116 Extreme Networks Consolidated e and i Series Hardware Installation Guide Summit Switch Installation...
Страница 137: ...Part 4 Alpine Switch...
Страница 138: ......
Страница 180: ...180 Extreme Networks Consolidated e and i Series Hardware Installation Guide Alpine 3800 Series Switch Management Module...
Страница 208: ...208 Extreme Networks Consolidated e and i Series Hardware Installation Guide Alpine 3800 Series I O Modules...
Страница 213: ...Part 5 BlackDiamond Switch...
Страница 214: ......
Страница 232: ...232 Extreme Networks Consolidated e and i Series Hardware Installation Guide BlackDiamond 6800 Series Switch Overview...
Страница 303: ...Part 6 Switch Operation...
Страница 304: ......
Страница 307: ...Part 7 Appendixes...
Страница 308: ......
Страница 314: ...314 Extreme Networks Consolidated e and i Series Hardware Installation Guide Safety Information...
Страница 376: ...376 Extreme Networks Consolidated e and i Series Hardware Installation Guide Installing GBICs and Mini GBICs...