. Use the bracket as a template to mark the holes on the ceiling.
For each of the four plastic anchors supplied with the unit, drill 4.8 mm (3/16"}
pilot holes, 24.5 mm (1") deep. If wall anchors are not being used drill 3.2 mm
(1/8") holes, 1 inch (25.4 mm) deep. Install the bracket using the screws from
the kit. The Altitude 300-2
™
is designed to slip into the mounting slots on the
bracket and slide all the way to the front, see Figure 5: Mounting the Wireless
Port on the Universal Mounting Bracket on page 23. The unit should then be
secured with either a padlock (not supplied) or a cable tie (supplied). The
installer may now follow the standard instructions for connecting the Ethernet
cable, antenna shrouds for integrated antennas, and the plastic cover.
WARNING!
The Altitude 300-2
™
is not secured to the bracket unless a padlock is used. If a
padlock is not used the unit should be secured to the bracket by a cable tie
through the lock hasp to keep it from falling. Failure to secure the unit is
hazardous.
Mounting Below A Hanging Ceiling
The Altitude 300-2
™
may be suspended from the T-Bars of a hanging ceiling.
The mounting kit contains two T-Bar fasteners that can be adjusted for a variety
of T-Bar widths. There are a number of round holes on the bracket that can be
used for the T-Bar fasteners; use two that are convent for the required
orientation on the ceiling. The bracket is oriented on the T-Bar with so that the
antennas face the desired direction. Use the bracket to lightly mark where the
T-Bar fasteners should be placed. Install the two T-Bar fasteners on the T-Bar,
see Figure 6: Installation on A Hanging Ceiling on page 24. Some ceilings have
ceiling tiles that hang down below the bottom of the T-Bar. Spacers are
provided with the kit for these types of tiles. The spaces go between the T-Bar
fasteners and the bracket with the spacer’s face against the bracket, see Figure 7:
Installation of Optional Spacer on page 25. Mount the bracket and make sure
fasteners are tight and the bracket is secure. The Altitude 300-2
™
is now slipped
into the bracket's mounting slots and slid all the way to the back, see Figure 5:
Mounting the Wireless Port on the Universal Mounting Bracket on page 23. The
unit should then be secured with either a padlock (not supplied) or a cable tie
(supplied). The installer may now follow the standard instructions for
connecting the Ethernet cable, antenna shrouds for integrated antennas, and the
plastic cover.
Содержание Altitude 300-2
Страница 6: ...6 Altitude 300 2 Getting Started Guide Figures...
Страница 8: ...8 Altitude 300 2 Getting Started Guide Tables...
Страница 12: ...12 Altitude 300 2 Getting Started Guide...
Страница 34: ...34 Altitude 300 2 Getting Started Guide Hardware Installation...
Страница 55: ...Reglatory Compliances Altitude 300 2 Getting Started Guide 55...
Страница 56: ...56 Altitude 300 2 Getting Started Guide Reglatory Compliances...
Страница 58: ...58 Altitude 300 2 Getting Started Guide Power Over Ethernet Connector Pin Assignments...
Страница 62: ...62 Altitude 300 2 Getting Started Guide Terminology...