2.7
Commissioning
Commissioning on the EBC10 must be carried out to ensure a correct draft from the system.
Commissioning should be carried out by staff with the appropriate training, and with the authorisation to do so
according to local legislation.
Do as follows:
Step
Action...
1
Provisional draft setting (negative pressure):
• Press
OK
to go to Menu 1
• Press
OK
• Press
or
until the negative required pressure appears in the display
• Press
OK
to confirm and save the set point
• Press
RESET
to return to the operation screen
2
• Start the system.
• Wait until the boiler starts and the draft has stabilised. The current draft will be
shown in the display
3
Final adjustment of draft:
• Check the draft on the boiler
• If draft is not correct, repeat the procedure from step 1
4
Check that the monitoring system shuts off the boiler
To simulate an error situation, disconnect the hose from the pressure transducer
(XTP). Burner is switched off (diode switches off) and the alarm diode illuminates
5
After completing the commissioning, check the start-up function by restarting the
system
For the set point values, please refer to the data for the boiler in question. However, the following values can be
considered typical:
• Boilers with forced draft: typically 20–30 Pa
• Boilers with atmospheric burners: typically 5–10 Pa
Set up according to site conditions can be determined by boiler commisioning engineer.
2.8
Special functions
2.8.1
Turning the ventilator on and off by means of a temperature sensor in the flue
The EBC10-boiler control can turn the ventilator on and off automatically by means of the temperature sensor, however
the ventilator can also be turned on and off manually.
3120049-EBC10-UK
22
• Pressure control