Setup
g285870
Figure 4
1.
Flip up discharge
deflector
3.
Operator Controlled
Discharge accessory
assembly
2.
Mounting pin inserted
into deck tube
4.
Rotate
•
For 36 and 32 inch models:
Install the
Adapter Kit prior to installing the Operator
Controlled Discharge accessory assembly.
–
For 36 inch model:
Use P/N 116-7043
–
For 32 inch model:
Use P/N 135-5313
(see Figure 5).
g285557
Figure 5
1.
Flip up discharge
deflector
3.
Operator Controlled
Discharge accessory
assembly
2.
Adapter kit
4.
Pivot the assembly towards the deck. The front
pin should engage into the slot in the deck or
adapter as shown in Figure 6.
g285600
Figure 6
1.
Front pin and slot
2.
Latch
3.
Operator Controlled Discharge accessory assembly
4.
Cable bulkhead jam nuts
•
If the front pin does not engage in the slot
in the deck or adapter, loosen or completely
remove the hardware in the gate link frame
as shown in Figure 7. Position the gate link
frame so that the front pin aligns with the slot.
Reinstall hardware, if removed, and tighten.
Pivot the assembly towards the deck and
engage the front pin into the slot.
8