02027011 ZSME300000342
4
EXCELL PRECISION CO., LTD.
SPECIAL NOTICE
While installing the load cell, power cord hookup or replacing a new rechargeable battery,
the indicator housing must be opened. It must be done by a technician assigned by your
electronic indicator provider to avoid affecting the waterproof ability of this indicator.
Before opening the housing, make sure the indicator is dry, if there is any liquid on it,
please wipe it with a clean cloth.
HOW TO INSTALL THE HOUSING
After installing the load cell, power cord hookup or replacing a new rechargeable battery,
the housing must be screwed by the assigned order as shown below. Screw lightly first,
then screw them tight using a 12 kgf-cm torsion.
P.s. Please use a torsion-adjustable screw driver.
Screwing order:
1
3
6
5
2
4
QWS
GWS
GWS
Содержание GWS
Страница 2: ......