Excalibur Excalibur P95-LP2 Скачать руководство пользователя страница 21

Excalibur P95-2 Zero Clearance Direct Vent Gas Fireplace

21

INSTALLATION

4) Separate the 2 halves of the wall thimble

and securely fasten the one with the tabs
to the outside wall making sure that the tabs
are on top and bottom. Fasten the other
thimble half to the inside wall. The thimble
halves slip inside each other and can be
adjusted for 2 x 4 or 2 x 6 walls. The liners
must slip over the collars a minimum
of 1-3/8".

5) Slip the assembled liner and termination

assembly through the thimble making sure
the termination cap faces up (there are
markings on the cap that show which way
is up). This will position the termination cap
with proper down slope for draining water.
Fasten the cap to the outer wall with the 4
supplied screws.

6) Pull the centre 5"(127mm) liner and outer

8"(203mm) liner out enough to slip over the
flue collars of the fireplace.  (You may wish
to cut the liner shorter to make it more
workable.) Do not bend liner more than 90

o

.

7) Apply Mill Pac over the fireplace inner collar

and slip the 5"(127mm) liner down over it
and attach with 3 supplied screws.

8) Do the same with the 8"(203mm) liner.

9) Apply a bead of silicone between the thim-

ble and termination and around the outer
edge of the terminal at the wall in order to
keep the water out.

IMPORTANT: Do not locate termination
hood where excessive snow or ice build-
up may occur. Be sure to check vent
termination area after snow falls, and clear
to prevent accidental blockage of venting
system. When using snow blowers, make
sure snow is not directed towards vent
termination area.

Note: To make the
installation more
aesthetically pleas-
ing, we recom-
mend framing out a
square to mount
the terminal to.

Offset Chart

INSTALLATION

PROCEDURES

for FPI Direct Vent

System (Flex)

1) Locate the unit in the framing, rough in the

gas (preferably on the right side of the unit)
and the electrical (Junction block is on the
left side) on the left. Locate the centerline
of the termination and mark wall according-
ly. Cut a 11"(279mm) hole in the wall (inside
dimension).

Note: A  3-1/2"(76mm) clearance around

the liner must be maintained ex-
cept that only a 1" (25mm) clear-
ance is needed at the termination
end. We recommend framing a
11"(279mm) x 11"(279mm) (inside
dimensions) hole to give struc-
tural rigidity for mounting the ter-
mination.

Note: If  installing termination on a siding

covered wall,  furring strips must
be used to ensure that the termi-
nation is not recessed into the
siding.

2) Level the fireplace and fasten it to the

framing using nails or screws through the
nailing strips.

3) Assemble the vent assembly by applying

Mill Pac to the 5"(127mm) inner collar of the
termination and  slipping the 5"(127mm) liner
over it at least 1-3/8" (35mm). Fasten with
the 3 screws (drilling pilot holes will make
this easier). Apply Mill Pac or high temper-
ature silicone to the 8"(203mm) flex pipe and
slip it over the 8"(203mm) outer collar of the
vent terminal at least 1-3/8"(35mm) and
fasten with the 3 screws.

NOTE: Horizontal sections must be sup-

ported at intervals not exceeding 3
feet (0.9 meter). (Flame picture and
performance will be affected by
sags in the liner).

roof pitches, the vertical height must be in-
creased.  A poor draft, or down drafting can
result from high wind conditions near big
trees or adjoining roof lines, in these cases,
increasing the vent height may solve the
problem.

7) Ensure vent is vertical and secure the base

of the flashing to the roof with roofing rails,
slide storm collar over the pipe section and
seal with a mastic.

8) Install the vertical termination cap by twist-

locking it.

Note: Any closets or storage spaces,

which the vent passes through
must be enclosed.

Содержание Excalibur P95-LP2

Страница 1: ...appliance Do not touch any electrical switch do not use any phone in your building Immediately call your gas supplier from a neighbour s phone Follow the gas supplier s instructions If you cannot rea...

Страница 2: ...urer s installation instructions and the Manufactured Home Construction and Safety Standard Title 24 CFR Part 3280 or the current Standard of Fire Safety Criteria for Manufactured Home Installations S...

Страница 3: ...ve 6 ManufacturedHomeAdditionalRequirements 6 Optional HeatWave Duct System 6 Optional Heat Release Kit 6 Clearances 6 CombustibleMantelClearances 7 P95 2 Flat Surround and Tile Kit 7 Unit Base Stand...

Страница 4: ...TE Excalibur units are constantly being improved Check the label on the unit and if there is a difference the label on the unit is the correct one SAFETY LABEL Copy of Safety Decal for P95 2 For the S...

Страница 5: ...building envelope Never vent to another room or inside a building Make sure that the vent is fitted as per Venting instructions 5 Inspect the venting system annually for blockage and any signs of det...

Страница 6: ...ull width and depth of the appliance 4 TheP95 2DirectVentGasFireplacecanbe installed in a recessed position or framed out into the room as in A B C D See Diagram 1 7 We recommend that you plan your in...

Страница 7: ...he fireplace itself These drawings are to scale at 1 6 one inch 6 inches Mantel can be installed anywhere in shaded area or higher using the above scale Note Ensure the paint that is used on the mante...

Страница 8: ...thick the unit must be raised 1 53 3 4 48 3 4 Header C L 21 1 8 533mm 2 1 4 4 2 Gas connection on this side Non combustible Material Combustible Material 11 dia hole through wall for Flex or for DuraV...

Страница 9: ...ore installation Back View of Cover Plate Pin Holes Top Clip Pins 2 Position bottom of cover plate over pins located at the bottom of the firebox Oblong Screw Holes 3 Bring cover plate towards the uni...

Страница 10: ...spring spacers 4 4 thimble 2 5 AstroCap XL termination cap 1 6 screws 12 7 tube of Mill Pac 1 8 plated screws 8 9 screws 8 x 1 1 2 Drill Point Stainless Steel 4 10 vinyl siding standoff If longer run...

Страница 11: ...14 36cm G Clearance to inside corner with AstroCap Termination Cap min 6 15cm with Dura Vent Termination Cap 12 30cm H Not to be installed above a meter regulator assembly within 3 90cm horizontally f...

Страница 12: ...Terminal must not be recessed into siding Measure the wall thickness including furring strips If a Vinyl Siding Standoff is required it must be used with vinyl siding measure to outside surface of wal...

Страница 13: ...1245B 45o Elbow Black 1245G 45o Elbow Swivel 1245BG 45o Elbow Black Swivel 1290 90o Elbow 1290B 90o Elbow Black 1290G 90o Elbow Swivel 1290BG 90o Elbow Black Swivel 5 x 8 Description 5 x 8 Description...

Страница 14: ...Vent pipe Maintain clearances to combustibles as listed on pages 6 to 8 Horizontal vent must be supported every 3 feet Firestops are required at each floor level and whenever passing through a wall A...

Страница 15: ...pipe length is 30 feet with minimum of 6 feet total vertical and maximum 8 feet total horizontal Please note minimum 1 foot between 90o elbows is required Option V H V V1 H H1 A 0 Min 1 Max 1 Min 2 M...

Страница 16: ...tal pipe length is 30 feet with min of 6 feet total vertical and max 8 feet total horizontal Please note min 1 foot between 90o elbows is re quired For additional vertical venting with 2 x 90o elbows...

Страница 17: ...stibles Note Must use optional flue adapter when using Simpson Dura Vent pipe Part 770 994 VENTING ARRANGEMENTS VERTICAL TERMINATIONS SIMPSON DURA VENT DIRECT VENT GS SYSTEM Propane Natural Gas The sh...

Страница 18: ...ions of straight vertical and offset to vertical terminations with Simpson Dura Vent Direct Vent GS vent systems for Propane and Natural Gas Maximum two 45o elbows allowed Vent must be supported at of...

Страница 19: ...s are designed to slide straight onto the male ends of adjacent pipes and fittings by orienting the four pipe indentations so they match and slideintothefourentryslotsonthemale ends Diagram 1 Push the...

Страница 20: ...at his point Next drop a plumb bob from the roof to the hole previouslydrilledintheceiling andmarkthe spot where the vent will penetrate the roof Determine if ceiling joists roof rafters or other fram...

Страница 21: ...S for FPI Direct Vent System Flex 1 Locate the unit in the framing rough in the gas preferably on the right side of the unit and the electrical Junction block is on the left side on the left Locate th...

Страница 22: ...ssure tap s using a 5 16 ID hose 4 Light the pilot and turn the valve to ON position 5 The pressure check should be carried out with the unit burning and the setting should be within the limits specif...

Страница 23: ...ow behind the orifice Burner Orifice Conversion Kit Contains Qty Part Description 1 910 018 SIT Conversion Kit 50 Turndown LP 1 910 037 LP Injector Pilot Orifice 1 904 431 Burner Orifice 49 1 908 255...

Страница 24: ...g OPTIONAL BRICK PANELS 1 Open the bottom louver door Loosen the 2 screws holding the Burner ON OFF switch and bracket to the bottom louver and lift the assembly out 2 Remove facade 3 Remove glass doo...

Страница 25: ...the top of Log 309 on Log 308 supported by the knot 11 Fit Log 310 on the pin and then swing the front end of the log to hit the first grate tab 12 Place the embers on the front of the burner tray 30...

Страница 26: ...ws from the mounting plate that are on the back of the facade Screw Remove screws from the mounting tabs 4 Slide Bottom Louver into position On each side secure the bottom screw first into the sidebra...

Страница 27: ...sert the new studs through the holes and secure them by first putting on the washer and then tighten with a nut DOUBLE SINGLEDOOROPTION 1 Remove the handles by removing the nut and screw Install the n...

Страница 28: ...nstall into the receptacle box CAUTION Do not connect millivolt wall switch wire to a 120V wire CAUTION Do not connect millivolt remote control wires to a 120V wire Thermostat Wire Table Option 3 WALL...

Страница 29: ...to the receptacle box provided with the unit in case the fan is installed at a later date CAUTION Label all wires prior to disconnection when servicing controls Wiring er rors can cause improper and...

Страница 30: ...aint curing process To ensure that the paint is properly cured it is recommended that you burn your fireplace for at least four 4 hours the first time before you use it with the fan on When first oper...

Страница 31: ...ube s and logs and is made of a different gauge material from the rest of the firebox and body Therefore the varying thick nesses of steel will expand and contract at slightly different rates which ca...

Страница 32: ...xcessive conden sation such as water droplets forming in the inner liner and subsequently dripping out the joints Continuous condensation can cause corrosion of caps pipe and fittings It may be caused...

Страница 33: ...ide with one screw 11 Attach the two control boxes to the bottom unit base and tighten the 2 screws on the left side and 1 screw on the right side 9 Connect the fan ground wire of Fan B and the power...

Страница 34: ...leeves through the brick panel to the firebox base reversing step 8 leaving them about 1 4 6mm above the brick panel Reinstall the rear log stand 12 Install Burner grate assembly 13 Hookupthegaslinean...

Страница 35: ...lts 910 331 P Fan Motor 120 Volts 770 523 Fan Switch Assembly 43 910 813 Power Cord 120 Volts 46 910 330 Fan Speed Control Switch 47 904 586 Knob Speed Control 48 910 199 Wire Holder Clip 49 910 142 T...

Страница 36: ...Excalibur P95 2 Zero Clearance Direct Vent Gas Fireplace 36 PARTS LIST...

Страница 37: ...10 378 Valve S I T Natural Gas 910 380 Valve S I T Propane 58 Valve Bracket 66 910 038 Pilot Assy 3 way flame S I T NG 910 039 Pilot Assy 3 way flame S I T LP 904 660 Orifice 30 Natural Gas 904 431 Or...

Страница 38: ...urround Louver 145 Surround Hood 146 Handle 148 Rivet 67 5 16 x 1 2 157 Carriage Bolt 948 221 Logo Plate 770 931 Double Screen Door Complete Black 770 932 Double Screen Door Complete Nickel 770 933 Do...

Страница 39: ..._________ ______________________________________________________ ______________________________________________________ _______________________________________________________________ ________________...

Страница 40: ..._________ ______________________________________________________ ______________________________________________________ _______________________________________________________________ ________________...

Страница 41: ..._________ ______________________________________________________ ______________________________________________________ _______________________________________________________________ ________________...

Страница 42: ..._________ ______________________________________________________ ______________________________________________________ _______________________________________________________________ ________________...

Страница 43: ...lts or costs of workmanship from unauthorized service persons or dealers At all times FPI reserves the right to inspect product in the field which is claimed to be defective All claims must be submitt...

Страница 44: ...__________________________ Printed in Canada Excalibur fireplace products are designed with relia bility and simplicity in mind In addition our internal Quality Assurance Team carefully inspects each...

Отзывы: