EVVO 20000TLG23P~EVVO 33000TLG23P
EVVO 20000TLG23P~EVVO 33000TLG23P
15
16
3
Installation
Outlines of this chapter
This topic describes how to install the EVVO 20000TLG23P~EVVO 33000TLG23P.
Installation notes
3.1 Installation Process
Figure3-1 Installation flowchart
3.2 Checking Before Installation
Checking Outer Packing Materials
Packing materials and components may be damaged during transportation. Therefore, check
the outer packing materials before installing the inverter. Checking the surface of packing
materials for damage, such as holes and cracks. If any damage is found, do not unpack the
inverter and contact the dealer as soon as possible. You are advised to remove the packing
materials within 24 hours before installing the inverter.
Checking Deliverables
3.1
I
n
3
3.1Installation Process
This topic describes the process for installing the EVVO 20000TLG23P~EVVO 33000TLG23P.
3.2
Checking Before Installation
Before unpacking, check that the packing materials are intact. After unpacking, check that the
deliverables are complete and intact for installer
3.3
Tools
Prepare tools required for installation and electrical connections.
3.4
Determining the Installation Position
Determine an appropriate position for installing inverter.
3.5
Moving the inverter
This topic describes how to move inverter to the installation position horizontally.
3.6
Installing the inverter
Before installing inverter, secure the shipped rear panel to the wall. Then secure inverter to
the rear panel by using hexagon screws.
After unpacking the inverter, check whether deliverable material are intact and
complete. If any
damage is found or any component is missing, contact the dealer.
Check the list in the table 3-1.
Danger
•
Do not install the inverter on flammable building materials.
•
Do not store the inverter in areas with flammable or explosive materials.
Caution
•
Do not install the inverter in places prone to body contact because the inverter shelf and heat sinks
become hot during the inverter operation.
Attention
•
Take the inverter weight into consideration when transporting and moving the inverter.
•
Install the inverter in an appropriate position and surface.
•
Assign at least two persons to install the inverter.
Moving the
inverter
Installation of the
rear panel
Installation of
inverter
End
Start
Check before
installation
Prepare installation
tools
Determine the
installation position