5. When all 4 pilot holes have been drilled, use the
25mm screws and O-Rings, provided, to screw the
box onto the Nexus. Use a pozi drive screwdriver to
tighten the 4 screws up.
500mm
Air line
6. Use the 4 screws and O-Rings you removed in
Step 2 to tighten up the lid on the Air Valve Control
box.
7. The Air Valve Control Box is fitted into position
ready for air line installations.
15