assembly instructions
-10-
Step 3
:
Attach the Squat Support (5) to the Side
Base (2) and Squat Base (4) using two
1/2" Washers (89) and two 1/2" Nylon
Nuts (93) for each.
Cap the Pec Dec Base (6) with one 2"
Sq End Plug (50) and one 2" Sq End
Cap (48). Attach the Pec Dec Base (6)
to the Base Frame (1) using two 1/2" x
3-1/8" Hex Head Bolts (71), six 1/2"
Washers (89) and four 1/2" Nylon Nuts
(93). Align the mounting holes in the
link plate (welded on Base Frame (1))
with the holes in the Pec Dec Base (6)
then attach with two 1/2" x 3-1/8" Hex
Head Bolts (71), four 1/2" Washers (89)
and two 1/2" Nylon Nuts (93).
Attach the Seat / Back Pad (31) to the
Pec Dec Base (6) using two 3/8" x 2-
3/4" Hex Head Bolts (79) and two 3/8"
Washers (90).
ASSEMBL
Y
LINK PLATE
Содержание EVO SEDONA 50551
Страница 7: ...parts diagram MANY PARTS SHOWN HAVE BEEN PRE ASSEMBLED BY THE FACTORY 7...
Страница 23: ...notes 23 NOTES...
Страница 30: ...notes 30 NOTES...
Страница 31: ...notes 31 NOTES...
Страница 32: ...Smooth Fitness 717 Fellowship Road Suite C Mt Laurel NJ 08054 Copyright 2002...