01
EVERFLO STAINLESS uV
uNVENTEd HOT WATER CyLINdERS
PAGE
CONTENT
2
Introduction
3
Storage, Handling & Supply Requirements
3
Component Table
4
Sitting the unit
5
General Installation
7-8
discharge Arrangement
9
Technical Specifications: Slimline - direct & Indirect
10
Technical Specifications: direct & Indirect
11
Technical Specifications: Solar direct
12
Technical Specifications: Solar Indirect
13
Solar Coil Installation
4
Solar High Limit
15
S-Plan Wiring Schematics
16
y-Plan Wiring Schematics
17 - 18
Pre-Plumbed Wiring Schematics
19
Pre-Plumbed Installation
20
Technical Specifications: Pre-Plumbed
21
System Fit Installation
22
Technical Specifications: System Fit
23
Commissioning & Servicing
24
Fault Finding & user Instructions
25 - 27
Guarantee - Terms & Conditions
28
Technical Specification
29 - 30
Specification & Performance
31
Benchmark
32
Commissioning Check Sheet
33
Service Record
INTROduCTION
The EVERFLO STAINLESS uV unvented cylinder is made from
duplex Stainless Steel for excellent corrosion resistance.
EVERFLO STAINLESS uV has a strong rust-proofed steel case
and is highly insulated with environmentally friendly foam.
EVERFLO STAINLESS uV is supplied complete with all the
necessary safety and control devices needed to connect
to the cold water mains. All are pre-adjusted. High quality
controls have been selected to combine high flow rate
performance with minimum pressure drop to make EVERFLO
STAINLESS uV perform well in all areas, even those with poor
water pressure.
EVERFLO STAINLESS uV is KIWA approved to show
compliance with Building Regulations G3+L.
Benchmark places responsibilities on both manufacturers and installers. The
purpose is to ensure that customers are provided with the correct equipment
for their needs, that it is installed, commissioned and serviced in accordance
with the manufacturer’s instructions by competent persons and that it meets
the requirements of the appropriate Building Regulations. The Benchmark
Checklist can be used to demonstrate compliance with Building Regulations
and should be provided to the customer for future reference.
Installers are required to carry out installation, commissioning and servicing
work in accordance with the Benchmark Code of Practice which is available
from the Heating and Hotwater Industry Council who manage and promote
the Scheme. Visit www.centralheating.co.uk for more information.
IMPORTANT NOTE TO
THE INSTALLER
Read these instructions before commencing installation.
unvented cylinders are a controlled service as defined in the
latest edition of the building regulations and should only be
fitted by a competent person.
The relevant regulations are: England and Wales – Building
Regulation G3, Scotland – Technical Standard P3, N Ireland –
Building Regulation Part F
After installation the Benchmark check list must be
completed and left, with these instructions, with the
householder for future reference.
IMPORTANT NOTE TO THE INSTALLER
Read these instructions before commencing installation. unvented cylinders are a controlled service
as defined in the latest edition of the building regulations and should only be fitted by a competent
person.
The relevant regulations are: England and Wales – Building Regulation G3, Scotland – Technical Standard
P3, N Ireland – Building Regulation Part F
After installation the Benchmark check list must be completed and left, with these instructions, with
the householder for future reference.
Содержание EDS120
Страница 35: ...34 EVERFLO STAINLESS UV UNVENTED HOT WATER CYLINDERS NOTES ...
Страница 37: ...Customer Services 0330 999 0035 ...