EUROSTER 11W Скачать руководство пользователя страница 9

EUROSTER 11W 

 USER MANUAL 

 

 

9

 

18.

 

CONNECTION DIAGRAM 

The  following  diagram  is  simplified  and  does  not  cover  all  the  elements  necessary  for  the 
correct operation of the system. 

 

1.

 

EUROSTER 11W

 

2.

 

CH boiler 

3.

 

Blower 

4.

 

Thermal protection  

5.

 

Temperature sensor  

6.

 

CH pump 

7.

 

Heat consumer 

 radiator 

 

19.

 

ELECTRONIC WASTE MANAGEMENT INFORMATION 

We  made  every  effort  to  ensure  that  this  controller  lifetime  is  as  long  as 
possible. However, the device is subject to natural wear. If the device would 
not meet  your  requirements any more, you are kindly  requested to  have it 
brought  in  to  an  electronic  waste  management  facility.  Electronic  waste  is 
collected free of charge by local distributors of electronic equipment. 
Inappropriate management of electronic waste may lead to an unnecessary 
pollution of the natural environment.  
Cardboard boxes must be disposed at a paper recycling facility. 

 

 

Содержание 11W

Страница 1: ...urnace and controls the operation of the CH circulation pump EUROSTER 11W controller is equipped with an ANTI STOP function that prevents seizing of an idle pump rotor It automatically turns the pump...

Страница 2: ...n the boiler in a point specially designed for that purpose or on an unshielded outlet pipe of the CH boiler as close to the boiler as possible using hose clip tighten the sensor to the pipe and cover...

Страница 3: ...ter displayed while previewing or changing the setting 2 Boiler temperature sensor icon 3 Manual operation mode icon lit while the temperature is manually adjusted 4 Alarm icon blinks in case of alarm...

Страница 4: ...select the number 0 or 1 and confirm Selecting 0 enables to change screen backlight functions without restoring factory defaults Selecting 1 restores factory settings bl Backlight will be displayed an...

Страница 5: ...gh to prevent the boiler temperature rise 6 Time interval between successive blow throughs This is the time passing between the end of the blow through cycle and the start of a new cycle It should be...

Страница 6: ...t then press it and hold down until the blower is started turn the controller power off and on Firing up is terminated if the boiler temperature is lower than the set temperature 1 by at most a half o...

Страница 7: ...The CH pump is turned off if the boiler temperature drops below the preset value by a half of the preset hysteresis T boiler TCH HCH 2 Power Alarm Temperature In case the temperature measured by the...

Страница 8: ...oad 2 A 230 V 50 Hz Maximum blower output load 0 5 A 230 V 50 Hz Maximum power consumption 1 6 W Temperature measurement range from 5 C to 110 C CH temperature adjustment range from 20 C to 80 C Boile...

Страница 9: ...e every effort to ensure that this controller lifetime is as long as possible However the device is subject to natural wear If the device would not meet your requirements any more you are kindly reque...

Страница 10: ...y by the manufacturer or by other party clearly authorized by the manufacturer 5 Warranty becomes invalidated in case of any mechanical damage incorrect operation and or making any repairs by unauthor...

Отзывы: