background image

EUROSTER 11E USER MANUAL

5

11 TROUBLESHOOTING
a) Device is dead

Burnt mains fuse or ROM failure. Replace the fuse or have the controller serviced.

b) Sensor icon on the display blinks, “Sh” or “OP” letters next to the icon

Sensor circuit shorted (Sh) or opened (OP). Check/replace the sensor cable or ship the 

controller (together with the sensor) to service.

c) Pump does not operate

Turn on the controller and make sure that pump icon is displayed. If not, check the presets or 
restore factory ones (see section Błąd: Nie znaleziono źródła odwołania). Check pump 

connection.

d) Controller knob operates erratically

Pulse generator failure. Have the controller serviced.

12 COMPATIBILITY WITH STANDARDS/CERTIFICATES

The 

EUROSTER 11E

 controller meets all requirements of the EMC and the LVD EU Directives. 

The CE Conformity Declaration is available on the 

http://www.euroster.com.pl 

Internet 

webpage.

13 SPECIFICATIONS

a) Mains

230 V 50Hz

b) Current consumption

max. 7 mA (1.6 W)

c) Output rated load

3 A

d) Length of cables

1,5 m 

e) Dimensions (width x height x depth) 150 x 90 x 54 mm

14 KIT CONTENTS

a) controller box with temperature sensor 
b) sensor hose clip

c) box fasteners/anchors
d) this Installation & Operation Manual

e) template to drill holes for fasteners/anchors

Содержание 11E

Страница 1: ...gainst seizing Once the heating season is over every 14 days the function automatically turns ON the pumps for 30 seconds To that end the controller must be left powered up 3 VISIBLE CONTROLLER ELEMEN...

Страница 2: ...power supply cable into a 230V 50Hz mains socket equipped with a grounding pin The controller must not be installed in a place where the ambient temperature may exceed 40 C 5 CONTROLLER DISPLAY Eleme...

Страница 3: ...s to change the mode Set 1 has been complied for layouts in which CH system pump is controlled Set 2 has been complied for layouts in which UHW pump is controlled Proceed as follows to restore factory...

Страница 4: ...0 80 80 C Pump hysteresis 4 4 2 2 10 10 C Temperature sensor correction 0 0 5 5 5 5 C Pump manual operation test as calculated by the controller as calculated by the controller 0 OFF 0 OFF 1 ON 1 ON 9...

Страница 5: ...d a odwo ania Check pump connection d Controller knob operates erratically Pulse generator failure Have the controller serviced 12 COMPATIBILITY WITH STANDARDS CERTIFICATES The EUROSTER 11E controller...

Страница 6: ...operate the system is shown Central heating pump control mode 1 EUROSTER 11E controller 2 CH boiler 3 Heat source temperature sensor 4 CH pump 5 Radiator heat load Utility hot water pump control mode...

Страница 7: ...arranty terms 1 Warranty is valid for 24 months from the controller sale date 2 Warranty is valid exclusively on the territory of Poland 3 Claimed controller together with this warranty certificate mu...

Отзывы: