background image

Designer Surround for H Series                                                                                                                                                         EuropeanHome.com

INSTALLATION

7

LAYING OUT THE PANELS

The panels of the 

Designer Surround for H Series 

are made to fit against the fireplace opening and each other. 

First, hold a metal panel up to the lower edge of the fireplace and mark the wall with a light pencil line along 

the lower edge of the metal panel(s). Then draw a straight line parallel to the right edge of the fireplace open-

ing at the distance shown below as appropriate for your surround model. The intersection of these two lines 

is the starting point for the installation.

Layout Lines for the Fulcrum 42

(not to scale)

9” right of  

fireplace opening

Layout Lines for the Fulcrum 60

(not to scale)

6” right of  

fireplace opening

Layout Lines for the Fulcrum 72

(not to scale)

6” down from fireplace

12” right of  

fireplace opening

Starting

Point

Starting

Point

Starting

Point

6” down from fireplace

6” down from fireplace

Содержание Fulcrum 42

Страница 1: ...rround for H Series EuropeanHome com F U L C R U M Designer Surround Installation Guide Exclusively designed to fit these European Home H Series Fireplaces November 2017 H 60 1 H 60 ST H 72 1 H 72 ST H 42 1 H 42 ST ...

Страница 2: ...2 Designer Surround for H Series EuropeanHome com TABLE OF CONTENTS Important Information 3 Specifications and Dimensions 5 Pre Installation Planning 6 Installation 7 Maintenance 12 Warranty 13 ...

Страница 3: ...nd Serial Number Thank you for your purchase of a Designer Surround for H Series Your Designer Surround for H Series is a proprietary combination of modern non combustible materials designed to please the eye and delight the senses Since your Designer Surround for H Series is designed to install and perform like ceramic tile it should be installed by a professional Please refer to your dealer for ...

Страница 4: ...D PANELS 4 12 18 48 Panel 72 Panel 84 Panel Tile Panel 42 Fulcrum 2 2 60 Fulcrum 4 2 72 Fulcrum 2 2 2 48 72 84 Fulcrum Tile Panel Fulcrum Metal Panels 6 6 6 Each surround contains Metal and Tile Panels according to the chart above All surround panels are 7 16 thick ...

Страница 5: ...ies EuropeanHome com SPECIFICATIONS and DIMENSIONS 5 60 H Series Fireplace 72 H Series Fireplace 96 120 30 30 42 H Series Fireplace 84 30 Tile Tile Metal Metal Metal Metal Metal Metal Metal Metal Metal Metal Tile Tile Tile Tile Fulcrum 42 Fulcrum 60 Fulcrum 72 ...

Страница 6: ...for completeness and any damage Contact your retailer if any damage is found Do not install your surround with any damaged or substituted parts For the best finished results please consider hiring a professional Carpenter or Contractor to install these surround panels You can also refer to your dealer Before you begin your installation you should have the following tools and supplies Gloves Pencil...

Страница 7: ...aw a straight line parallel to the right edge of the fireplace open ing at the distance shown below as appropriate for your surround model The intersection of these two lines is the starting point for the installation Layout Lines for the Fulcrum 42 not to scale 9 right of fireplace opening Layout Lines for the Fulcrum 60 not to scale 6 right of fireplace opening Layout Lines for the Fulcrum 72 no...

Страница 8: ...he metal panels and tile panels should be applied to the wall in the order shown below Fulcrum 42 Fulcrum 60 Fulcrum 72 2 Metal 1 Metal 3 Tile 4 Tile 5 Metal 6 Metal 2 Tile 3 Tile 1 Metal 4 Metal 2 Metal 1 Metal 3 Tile 4 Tile 5 Metal 6 Metal INSTALLATION WALL LAYOUT ...

Страница 9: ...P REFER TO GRAPHICS ON PAGES 10 11 Use a stud finder to mark the stud locations above below and flanking the fireplace within the relevant area you will be installing the surround Screw into these locations for structural integrity Note you can drill into the fireplace cabinet using 3 4 self tapping screws The included z clips should exceed 16 slightly Holes are predrilled to 16 to line up with th...

Страница 10: ...del below Red lines Represent guidelines for Z clip draw these in as guides for mounting 6 6 24 9 33 Layout Lines for the Fulcrum 42 not to scale red lines for z clips 6 6 24 6 30 Layout Lines for the Fulcrum 60 not to scale red lines for z clips 6 6 24 12 36 Layout Lines for the Fulcrum 72 not to scale red lines for z clips 2 3 16 2 5 16 2 5 16 2 3 16 2 5 16 2 5 16 2 3 16 2 5 16 2 5 16 ...

Страница 11: ...measurements appropriate to your model below Red lines Represent guidelines for Z clip draw these in as guides for mounting 6 6 24 6 Align Z Clips to the Red Lines 2 5 16 2 5 16 2 3 16 6 6 24 12 Align Z Clips to the Red Lines 2 5 16 2 5 16 2 3 16 6 6 24 9 Align Z Clips to the Red Lines 2 5 16 2 5 16 2 3 16 42 not to scale 60 not to scale 72 not to scale ...

Страница 12: ...NTENANCE Weekly Cleaning Both the metal and tile panels should be wiped with a lint free cloth to remove any dust then wiped with a damp cloth Yearly Cleaning Both the metal and tile panels should be wiped with a lint free cloth to remove any dust then wiped with a damp cloth ...

Страница 13: ...rom the date of replacement or repair whichever provides longer coverage for you When a product or part is exchanged any replacement item becomes your property and the replaced item becomes the property of European Home All warranty claims must be submitted through the dealer from which you purchased the product Check with your dealer in advance for any costs to you when arranging a warranty call ...

Страница 14: ...14 Designer Surround for H Series EuropeanHome com EUROPEAN HOME a division of Europa Ja Inc 30 Log Bridge Road Building 300 Suite 303 Middleton MA 01949 www europeanhome com IGHVFFS 1 0 ...

Отзывы: