background image

JP4

JP5

JP6





JP4

JP5

JP6

JP4

JP5

JP6

JP4

JP5

JP6

JP9

230V

3.3 

START DEVICES

Wire the START contact (N.O. contact) to 

1 – 4

, terminal 

JP4

.

An additional 

START

 contact can be wired in 

PARALLEL

 (N.O. contact)

3.4 

PEDESTRIAN OPENING

Wire the 

PEDESTRIAN START

 (N.O. contact) to 

3-4

, terminal 

JP4

.

An additional 

PEDESTRIAN START

 contact can be wired in PARALLEL 

(N.O. contact).

OROLOGIO

3.3.2 KEY SWITCH

Wire the 

KEY SWITCH

 (N.O. contact) to 

1-4

, terminal 

JP4

.

3.2 

MAIN POWER

The main line must be protected by a proper CIRCUIT BREAKER.

Connect  the  line  230V  to 

18-19-20

,  terminal 

JP9

,  fulfilling  the 

polarity (18 PHASE – 19 EARTH – 20 NEUTRAL)

CIRCUIT 

BREAKER

PHA

SE

NEUTR

AL

PEDESTRIAN 

START 

3.3.1 TIMER 

It is possible to wire a 

TIMER

 (N.O. contact) to 

1-4

, terminal JP4.

ATTENTION!:

when connecting a TIMER, the multi-users function 

must be enabled. SW1 DIP 2 = ON 

Содержание Q81S

Страница 1: ...ion and lock pulse function Built in radio receiver 433 92 MHz 32 codes suitable for fixed or rolling code transmitters Input for 8K2 resistive safety edge Self diagnosis of malfunctions by LED coding 230Vac TECHNICAL FEATURES Instructions Manual Item code PQ81S Pcb s dimensions 137 x 84 x 37 mm Pcb s weight 160 g Main power supply 230V 50 60Hz Power supply tolerance 10 20 Transformer 230 21Vac 15...

Страница 2: ...dge in OPENING 3 8 FLASHING LIGHT pag 10 3 9 HOV TO PLUG THE 2 RADIO CHANNEL JACK pag 10 3 9 1 Auxiliary radio channel AUX 3 9 2 Signalling light 3 9 3 CCourtesy light 4 DEFAULT SETTINGS pag 11 5 BROWSING THE MENU 5 1 FUNCTIONS MENU 5 1 1 Automatic closing 5 1 2 8K2 RESISTIVE SAFETY EDGE INPUT cut the power off 6 OPERATION MODE pag 12 7 RADIO CODES pag 14 7 1 HOW TO DELETE EXISTING RADIO CODES 7 2...

Страница 3: ...ssociated Always cut the power off before operating Make sure the earth connection is duly wired Wiring installation and functional tests must be carried out by expert qualified per sonnel in full compliance with current regulation EN12453 Use of this control panel must be restricted to the transformer supplied by the Ma nufacturer A circuit breaker must be fitted close to the gate in compliance w...

Страница 4: ...secondary K1 K3 motor relé K4 flashing light relé TR2 filter JP1 GREEN TERMINAL aerial connection JP2 Secondary MOLEX card 24V ac JP3 Primary MOLEX card 230V ac JP4 BLUE TERMINAL command devices JP5 RED TERMINAL line and photocells JP6 YELLOW TERMINAL flashing light JP7 BLACK TERMINAL limit switch JP8 ORANGE TERMINAL motor JP9 GREEN TERMINAL line 230V earth JP10 GREEN TERMINAL safety edge resistiv...

Страница 5: ... JP7 1 2 3 4 5 6 7 8 9 10 11 15 16 17 18 19 20 12 13 14 V1 OP1 U2 X3 JP10 23 24 DL3 DL4 DL5 DL6 DL7 DL8 N C FR2 DL9 DL10 8K2 PHASE NEUTRAL EARTH CLOSE CAPACITOR FLASHING LIGTH 24V ac MAX 20w PEDESTRIAN STOP START NEUTRAL CLOSING PHOTOCELLS OPENING PHOTOCELLS PHOTOCELLS IN CLOSING PHOTOCELLS IN OPENING 24V RX 24V TX RX TRANSFORMER 230V 21V RED RED BLACK BLACK WIRING Diagram for 230Vac OPERATORS 24V...

Страница 6: ...contact 6 photocell in opening N C contact 7 RX photocells 24V 8 TX RX 24V 9 TX photocells 24V JP6 YELLOW TERMINAL flashing light 10 flashing light 24V ac max 20W 11 flashing light 24V ac max 20W JP7 BLACK TERMINAL LIMIT SWITCH 12 neutral 13 limit switch in closing 14 limit switch in opening JP8 ORANGE TERMINAL MOTOR 15 OPEN 16 NEUTRAL MOTOR OUTPUT 17 CLOSE JP9 GREEN TERMINAL line 230V earth 18 LI...

Страница 7: ...tion Gate opening from left to RIGHT viw from inside courtyard FC OPEN NEUTRAL FC CLOSING Gate opening from right to LEFT view from isnide property The control unit is pre set for gate opening from left to right looking from inside the courtyard as shown in the drawing OUTSIDE INSIDE OUTSIDE INSIDE Right gear motor Left gear motor 3 4 JP7 BROWN BLACK BLUE COMMON MECHANICAL LIMIT SWITCH MAGNETIC LI...

Страница 8: ...T contact can be wired in PARALLEL N O contact OROLOGIO 3 3 2 KEY SWITCH Wire the KEY SWITCH N O contact to 1 4 terminal JP4 3 2 MAIN POWER The main line must be protected by a proper CIRCUIT BREAKER Connect the line 230V to 18 19 20 terminal JP9 fulfilling the polarity 18 PHASE 19 EARTH 20 NEUTRAL CIRCUIT BREAKER PHASE NEUTRAL PEDESTRIAN START 3 3 1 TIMER It is possible to wire a TIMER N O contac...

Страница 9: ...otocell in closing during installation plug 5 and 9 together 3 6 2 Photocells in OPENING Feed the photocells through 7 8 9 terminal JP5 Wire the photocell contact N C contact to 6 7 terminal JP5 An additional photocell set can be wired in SERIES N C contact If the photocell beam is broken during OPENING the gate stops and reverses for 3 sec The PHOTOCELLS IN OPENING are important for the safety of...

Страница 10: ...the contact is broken during CLOSING the gate stops and reverses If the contact is broken during OPENING the gate keeps on working normally 3 7 2 Mechanical safety edge in OPENING Wire the safety edge to 6 9 terminal JP5 If the contact is broken during OPENING he gate stops and reverses after 3 sec If the contact is broken during CLOSING the gate keeps on working normally Mechanical safety edge ph...

Страница 11: ...he power off before proceeding ATTENTION Wire the 8K2 safety edge to 6 9 terminal JP5 Press SET SET TX together and feed the control panel If the contact is broken during OPENING the gate stops and reverses for 3 sec If the contact is broken during CLOSING the gate keeps on working normally 8K2 SAFETY EDGE PHOTOCELLS IN OPENING cut the power off before proceeding ATTENTION Wire the 8K2 safety edge...

Страница 12: ...u wish to choose this function mode select the switches as follows 1 OFF 2 ON 3 OFF 4 NO EFFECT TIMED COMMANDA The contact ACTIVATES when giving a start command by the remote control and stays for 90 seconds If you wish to choose this function mode select the switches as follows 1 ON 2 ON 3 OFF 4 NO EFFECT 3 9 2 Signalling LIGHT TThe contact ACTIVATES at OPENING and DESACTIVATES only at FINAL CLOS...

Страница 13: ...l panel starts the count down Press BREAK again when reached the desired time the blinker turns off The time has been set automatic closing time max 120 sec To desactivate the AUTOMATIC CLOSING Press SET for 3 sec and release the led DL1 blinks Press BREAK and hold for 5 sec the AUTOMATIC CLOSING has been deactivated 5 1 2 8K2 RESISTIVE SAFETY EDGE INPUT cut the power off To activate the 8K2 input...

Страница 14: ...nal START commands during OPENING and AUTOMATIC CLOSING COUNT DOWN dip n 2 dip n 3 dip n 4 OFF MULTI OCCUPATION mode DEACTIVATED ON MULTI OCCUPATION mode ACTIVATED OFF Soft start mode DEACTIVATED At opening motors work at the set thrust POWERO ON Soft start mode ACTIVATED At opening motors perform at maximum thrust for 1 5 sec to continue after at the set thrust OFF Motor and photocell TEST DEACTI...

Страница 15: ... dip n 1 dip n 2 dip n 3 dip n 4 ON OFF Motor positioned on the RIGHT Default ON Motor positioned on the LEFT OFF ON OFF Standard slow down Default ON Soft slow down ACTIVATED OFF ON OFF Mantained action DEACTIVATED Default ON Maintained action ACTIVATED OFF ON OFF N C contact limit switches Default ON N O contact limit switches OFF ...

Страница 16: ...7 1 DELETING EXISTING RADIO CODES Press SET TX and keep pressed for 10 seconds DL1 blinks DL1 turns off All codes have been deleted 7 2 LOADING A REMOTE CONTROL AS START COMMAND Press SET TX once DL1 blinks 1 blink stop 1 blink Load within 5 sec the remote control you wish to store The control panel has stored the radio code and goes out the programming automatically It is possible to load until 3...

Страница 17: ...n SENS sensitivity clockwise to Press SET and keep pressed for 10 sec DL1 starts blinking When motor starts working release SET Motor runs firstly a FULL OPENING till reaching the limit switch in opening Then it starts CLOSING till reaching the closing limit switch When the procedure is finished all time settings are saved The control panel is now ready for normal operation ATTENTION Check the pro...

Страница 18: ... maximum position to Programming can be carried out both with the remote control or WORK button Press TEST for 3 sec DL1 starts blinking release Press the button of the remote control previously loaded The gate STARTS OPENING At 80 of opening press the remote control to start SLOW DOWN till reaching the opening limit switch Now operational settings are LOADED The gate starts closing until reaching...

Страница 19: ... the ACCESSORIES wired to the START N O contact see section 3 3 Check the wiring otherwise deactivate the input Check the wiring diagram see section 3 5 Check the photocell alignment Check and remove the obstacle Check the wiring diagram Check the power connection Disable the photocell input see section 3 6 Check the connection N C and the good operation of the safety edge Check the photocell alig...

Страница 20: ...ts of EEC Direc ves 20 5 EC ow Voltage Direc ve 20 4 0 EC Electromagne c Compa bility Direc ve 2014 53 Radio Telecommunica ons Terminal Equipments Direc ve The manufacturer declares that the start up of the machinery is not permi d unless the machine in which the product is incorporated or of which is becoming a component has been ide ed and declared as conformed to 2006 42 EC Machinery Dire ve No...

Отзывы: