00103748.DOC, Version 1.0
28/44
(4)
DMX input
(5)
DMX output
(6)
Power input
(7)
Power switch
(8)
Fuse holder
(9)
Rubber feet
(10)
Fans
INSTALLATION
Rigging
The installation of the projector has to be built and constructed in a way that it can hold 10 times the weight
for 1 hour without any harming deformation.
The installation must always be secured with a secondary safety attachment, e.g. an appropriate catch net.
This secondary safety attachment must be constructed in a way that no part of the installation can fall down
if the main attachment fails.
When rigging, derigging or servicing the fixture staying in the area below the installation place, on bridges,
under high working places and other endangered areas is forbidden.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert before taking into operation for the first time and after changes before taking into operation another
time.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert after every four year in the course of an acceptance test.
The operator has to make sure that safety-relating and machine-technical installations are approved by a
skilled person once a year.
Procedure:
The projector should be installed outside areas where persons may walk by or be seated.
IMPORTANT! OVERHEAD RIGGING REQUIRES EXTENSIVE EXPERIENCE, including (but not limited to)
calculating working load limits, installation material being used, and periodic safety inspection of all
installation material and the projector. If you lack these qualifications, do not attempt the installation yourself,
but instead use a professional structural rigger. Improper installation can result in bodily injury and.or
damage to property.
DMX OUT
1: Ground
2: Signal (–)
3: Signal (+)
DMX IN
100-240 V AC, 50/60 Hz
POWER IN
ON
OFF
FUSE:
T2A/250V
4
5
6
7
8
9
10
10
2
2
Содержание LED MFX-9
Страница 1: ......