00094572.DOC, Version 1.0
16/18
Before rigging make sure that the installation area can hold a minimum point load of 10 times the device's
weight.
Mount the device with the bracket to your trussing system using an appropriate clamp.
For overhead use, always install an appropriate safety bond.
You must only use safety bonds and quick links complying with DIN 56927, shackles complying with DIN EN
1677-1 and BGV C1 carbines. The safety bonds, quick links, shackles and the carbines must be sufficiently
dimensioned and used correctly in accordance with the latest industrial safety regulations (e. g. BGV C1,
BGI 810-3).
Please note:
for overhead rigging in public or industrial areas, a series of safety instructions have to be
followed that this manual can only give in part. The operator must therefore inform himself on the current
safety instructions and consider them.
The manufacturer cannot be made liable for damages caused by incorrect installations or insufficient safety
precautions!
Pull the safety bond through the attachment eyelet and over the trussing system or a safe fixation spot.
Insert the end in the quick link and tighten the safety screw.
The maximum drop distance must never exceed 20 cm.
A safety bond which already hold the strain of a crash or which is defective must not be used again.
Adjust the desired inclination-angle via the mounting-bracket and tighten the fixation screws.
DANGER TO LIFE!
Before taking into operation for the first time, the installation has to be approved by an expert!
Connection with the mains
Connect the device to the mains with the enclosed power supply cable.
The occupation of the connection cables is as follows:
Cable Pin
International
Brown Live
L
Blue Neutral
N
Yellow/Green Earth
The earth has to be connected!
If the device will be directly connected with the local power supply network, a disconnection switch with a
minimum opening of 3 mm at every pole has to be included in the permanent electrical installation.
The device must only be connected with an electric installation carried out in compliance with the IEC
standards. The electric installation must be equipped with a Residual Current Device (RCD) with a maximum
fault current of 30 mA.
OPERATION
For smoke emission, turn the device on via the SMOKE Power switch.
After a certain warm-up time, the device is ready to operate. Then the stand-by lamp of the remote control
lights up green. By operating the smoke switch on the remote control the smoke emission starts. It may