background image

© EUROHEAT DISTRIBUTORS (H.B.S) LTD. July 2011

 

 Instructions Part Number IN1231 Ed 1

30

CE Declaration of Conformity

We, SHT Heiztechnik aus Salzburg GmbH, A-5101 Salzburg-Bergheim, Rechtes Salzachufer 40, hereby declare 
that the boilers supplied by us, model series EEVVOO AAQQUUAA,with 9 kW and 15 kW outputs, comply with 
the provisions of the Machinery Safety Directive (MSV, BGBl. No. 306/1994) and therefore with the Machinery 
Directive 2006/42/EC implemented by the above, the EMC Directive 89/336/EC and Directive 2004/108/EC, 
the Low Voltage Directive 2006/95/EC, as well as the relevant technical safety regulations.

The  production  process  is  subjected  to  an  ongoing  appropriate  quality  control  programme  and  is  certified 
periodically by an accredited, authorised test institution. The boiler models comply with the legal requirements 
and relevant standards for marketing according to Art. 15a BVG (on the basis of EN 303-5).

In this respect the boiler models undergo type testing at one or more accredited and authorised test centres.
The original test certificates are held by the manufacturer.

The conformity of the designated products with the above-mentioned directives is demonstrated by compliance 
with the following standards by way of example:

ÖNORM M7550, ÖNORM M 7510/1, ÖNORM M 7510/2, ÖNORM B8130, ÖNORM B8131, ÖNORM B8133,
DIN 4751 Part 1, DIN 4751 Part 2, DIN 4751 Part 4, DIN 1988, ÖNORM EN 303-5, EN 60335/VDE 0700 Part 
1/12.91 and VDE 0722/4.83

Originator:    

 

 

Dipl. Ing. Thomas Bauer 

 

 

Dipl. Ing. Harald Berger

 

 

 

 

 

HET Development Manager   

 

SHT Technical Manager

Legally binding signature:

Place, Date:   

 

 

 

 

 

 

 

        Salzburg-Bergheim, 27.02.2009

Содержание EVO Aqua

Страница 1: ...Instructions EVO Aqua EVO Aqua 9kW EVO Aqua 15kW IN1231 Edition A Date July 2011 PART NUMBER SERIAL NUMBER This manual must be used in conjunction with document IN1173 The Wood and Mutlifuel Chimney...

Страница 2: ...on 12 3 6 Room and Ambient Temperatures Humidity 12 3 7 Flue Connection 12 4 Pellet Quality 13 5 Boiler Return Flow Temperature 13 5 1 Buffer Cylinder 13 6 Cleaning Maintenance and Servicing 13 7 Comp...

Страница 3: ...suitable fire guard It is imperative that all air passageways into out of and within the appliance are kept clean All permanent ventilation into the room provided for the stove must remain clear and u...

Страница 4: ...confirm with the user that it is their responsibility to return it to Euroheat In this way the model and its history will be recorded for reference in the future For the latest versions of manuals te...

Страница 5: ...on OGC Nitrogen oxides NOx referred to the rel energy referred to the O2 content of referred to the rel energy referred to the O2 content of referred to the rel energy referred to the O2 content of re...

Страница 6: ...ory brick 7 Comb grate 8 Ash pan 9 Base plate 10 Comb grate motor 11 External air connection 12 Ignition element 13 Screw conveyor motor 14 Rotary valve 15 Screw conveyer 16 Pellet hopper 1 Pellet hop...

Страница 7: ...me of 1 5 2 hours per combustion cycle with the boiler at a minimum of 50 of its rated output FUEL AND SET UP The stove must be operated by a competent operator using only the appropriate fuel as spec...

Страница 8: ...oiler must be able to be discharged to the outside This is achieved to a lesser extent approximately 10 to 15 via the glass in the door and the outer shell of the boiler Most of the heat 85 to 90 is t...

Страница 9: ...permanent air vent must be provided Operating open flue stoves in combination with other extraction ventilation systems is only permitted under specific conditions Rika SHT pellet boilers need approxi...

Страница 10: ...room providing that distance C is observed or the flue tube is inserted directly in the rear wall E 20 cm distance from rear wall if the boiler is installed without automatic conveying system E 20 cm...

Страница 11: ...designed to be load bearing and fireproof The following minimum dimensions should be observed when positioning the stove on the plinth or tiled floor At least 30 cm on each side of the plinth and at l...

Страница 12: ...om and Ambient Temperatures Humidity The appliance is designed to operate in living rooms with normal humidity and ambient temperatures of 5 C to 40 C If there is a possibility of the room temperature...

Страница 13: ...well compacted pellets will sink and poorly compacted pellets will float because of their differing densities 5 Boiler Return Flow Temperature The boiler return flow temperature must never fall below...

Страница 14: ...as described in Section 5 Before starting to install the boiler the hydraulic connection Section 10 the electrical connection Section 8 and the flue connection Section 9 of the system must be establis...

Страница 15: ...swivel out to permit access to other components To do this remove the two socket screws 7 3 Access to Hydraulic Connections After removing the right side wall and swivelling out the right rear column...

Страница 16: ...d in accordance with the applicable regulations We accept no liability in the event of any damage caused by incorrect connections and the warranty will be void No electrical connecting cables from and...

Страница 17: ...lower sensor should be located in the boiler return flow line and the distance from the upper sensor should be selected such that the necessary volume exists between the sensors As soon as the buffer...

Страница 18: ...s higher than 15 Pa we recommend fitting a draught regulator in the flue This must not draw air from the installation room In order to guarantee optimum combustion the number of bends in the flue pipe...

Страница 19: ...close to the boiler as possible to ensure the temperature at which the device is operating at corresponds exactly to the boiler return temperature Boiler circuit pump should be set to a minimum flow...

Страница 20: ...11 Instructions Part Number IN1231 Ed 1 20 10 2 Hydraulic Diagrams 2 1 3 4 0 bar 2 1 3 4 0 bar 4 3 5 E S B E 2 0 6 0 4 0 8 0 1 0 0 C o 1 2 0 0 E S B E 2 0 6 0 4 0 8 0 1 0 0 C o 1 2 0 0 E S B E 2 0 6 0...

Страница 21: ...these parts during operation A warning sticker reiterating this is also located on the inside of the pellet filling cover Always keep the combustion chamber door closed even when cold When handling th...

Страница 22: ...ectly 5 Check Flue Tube Construction Check all joints in the flue system are sealed and air tight If using a draught stabiliser recommended set the draught stabiliser to the lowest possible negative p...

Страница 23: ...e pellet screw conveyor requesting the amount of fuel required for ignition with minimum smoking smoke maximum approx 10 30 seconds in combustion chamber the flame then establishes itself slowly 14 Ch...

Страница 24: ...O Menu I O Menu I O Menu I O Menu I O 02 Ignition time 1 XXX 03 Feed XXX 04 Ignition time 2 Flashing XXX adjust with 04 Ignition time 2 XXX 05 Number of ignition attempts XXX Parameters I O Daily ext...

Страница 25: ...lt detection Flashing XXX adjust with Menu I O 08 Flame temp fault detection XXX R1 PID_P Flashing XXX adjust with Menu I O R1 PID_P XXX Menu I O R3 PID_D Flashing XXX adjust with Menu I O R3 PID_D XX...

Страница 26: ...enu Operating mode Setup Info Suction Conveying System 80 in sub menu I O BUTTON pressed for 5 sec Sub menu Basic menu ON OFF BASIC MENU Menu I O Boiler Mode Temperatures Heating Stage Operation Appli...

Страница 27: ...illing chamber door All screws tight switch point door contact switch OK Filling chamber door Checked for tightness paper strip test Ash door All screws tight particularly the high screws at the botto...

Страница 28: ...e at the container must be pushed in to the stop and sealed with the insulation tape enclosed Filled recorder in the pellet supply container Remove a few handfuls of pellets and place them in a cardbo...

Страница 29: ...BUTORS H B S LTD July 2011 Instructions Part Number IN1231 Ed 1 29 Main function with buffer management Main function without buffer management External requirement ON OFF External requirement ON OFF...

Страница 30: ...d is certified periodically by an accredited authorised test institution The boiler models comply with the legal requirements and relevant standards for marketing according to Art 15a BVG on the basis...

Страница 31: ...EUROHEAT DISTRIBUTORS H B S LTD July 2011 Instructions Part Number IN1231 Ed 1 31...

Страница 32: ...491112 Technical 01885 491117 Reception 01885 491100 Need more info With over 10 000 pages of technical information spare parts product shots news and 1001 other things you will not find a more compr...

Отзывы: