8  Electrical Connection/Equipment Interfaces

The  EVO  AQUA  boiler  is  delivered  ready-wired.  Check  that  none  of  the  cables  have  become  detached.  The 
control circuit board is located under the left side cladding of the boiler, when viewed from the front. 
Note the instructions in the lower half of this page!
 

 

8.1  Power Supply/Main Fuse

The device is designed exclusively for operation with 230 V AC / 50 Hz. It is connected by a 3-pole mains cable 
with a shockproof plug. A protective earth device is essential.
A 5 x 20 2.5 A T glass fuse is provided as the integral main fuse. The fuse is located on the left rear side of the 
boiler. 

Important Information:

The electrical supply must be isolated before carrying out any work on the appliance. The electrical supply must 
be isolated when connecting an automatic pellet conveying system.

Electrical connections on the appliance must be performed by a qualified engineer and in accordance with the 
applicable regulations. We accept no liability in the event of any damage caused by incorrect connections and 
the warranty will be void.

No electrical connecting cables from and to the appliance must come into contact with hot external surfaces of 
the stove or flue tube. The cables must not be laid over sharp edges.

8.2  Pin Assignment in Main Control Unit

Notes:

The external control terminals have a cable bridge which allows the boiler to heat up when ever energised. 
An external controller such as a room thermostat or timer can be connected at this point after removing the 
bridging wire. No voltage must be applied.

Never connect the boiler mains input via any external controller such as a time clock, as this will prevent the 
boiler shutdown sequence.

Never remove the electrical supply in order to stop the burner. The burner can only be shut down correctly by 
opening the external control terminal loop or by switching off manually.

1

2

3

4

5

6

7

8

18 17 16 15 14 13 12 11 10

9

2

3

1

4

4

2

3

5

6

7

8

9

10

11

12

1

1

2

3

Atmal

J2

J1

J3

J1

2

J8

J1

1

J10

J9

J6

J4

External control terminals- 24 V, 6 mA. The 
connection  terminals  for  potential-free 
external control devices. 

 

Содержание EVO Aqua

Страница 1: ...Instructions EVO Aqua EVO Aqua 9kW EVO Aqua 15kW IN1231 Edition A Date July 2011 PART NUMBER SERIAL NUMBER This manual must be used in conjunction with document IN1173 The Wood and Mutlifuel Chimney...

Страница 2: ...on 12 3 6 Room and Ambient Temperatures Humidity 12 3 7 Flue Connection 12 4 Pellet Quality 13 5 Boiler Return Flow Temperature 13 5 1 Buffer Cylinder 13 6 Cleaning Maintenance and Servicing 13 7 Comp...

Страница 3: ...suitable fire guard It is imperative that all air passageways into out of and within the appliance are kept clean All permanent ventilation into the room provided for the stove must remain clear and u...

Страница 4: ...confirm with the user that it is their responsibility to return it to Euroheat In this way the model and its history will be recorded for reference in the future For the latest versions of manuals te...

Страница 5: ...on OGC Nitrogen oxides NOx referred to the rel energy referred to the O2 content of referred to the rel energy referred to the O2 content of referred to the rel energy referred to the O2 content of re...

Страница 6: ...ory brick 7 Comb grate 8 Ash pan 9 Base plate 10 Comb grate motor 11 External air connection 12 Ignition element 13 Screw conveyor motor 14 Rotary valve 15 Screw conveyer 16 Pellet hopper 1 Pellet hop...

Страница 7: ...me of 1 5 2 hours per combustion cycle with the boiler at a minimum of 50 of its rated output FUEL AND SET UP The stove must be operated by a competent operator using only the appropriate fuel as spec...

Страница 8: ...oiler must be able to be discharged to the outside This is achieved to a lesser extent approximately 10 to 15 via the glass in the door and the outer shell of the boiler Most of the heat 85 to 90 is t...

Страница 9: ...permanent air vent must be provided Operating open flue stoves in combination with other extraction ventilation systems is only permitted under specific conditions Rika SHT pellet boilers need approxi...

Страница 10: ...room providing that distance C is observed or the flue tube is inserted directly in the rear wall E 20 cm distance from rear wall if the boiler is installed without automatic conveying system E 20 cm...

Страница 11: ...designed to be load bearing and fireproof The following minimum dimensions should be observed when positioning the stove on the plinth or tiled floor At least 30 cm on each side of the plinth and at l...

Страница 12: ...om and Ambient Temperatures Humidity The appliance is designed to operate in living rooms with normal humidity and ambient temperatures of 5 C to 40 C If there is a possibility of the room temperature...

Страница 13: ...well compacted pellets will sink and poorly compacted pellets will float because of their differing densities 5 Boiler Return Flow Temperature The boiler return flow temperature must never fall below...

Страница 14: ...as described in Section 5 Before starting to install the boiler the hydraulic connection Section 10 the electrical connection Section 8 and the flue connection Section 9 of the system must be establis...

Страница 15: ...swivel out to permit access to other components To do this remove the two socket screws 7 3 Access to Hydraulic Connections After removing the right side wall and swivelling out the right rear column...

Страница 16: ...d in accordance with the applicable regulations We accept no liability in the event of any damage caused by incorrect connections and the warranty will be void No electrical connecting cables from and...

Страница 17: ...lower sensor should be located in the boiler return flow line and the distance from the upper sensor should be selected such that the necessary volume exists between the sensors As soon as the buffer...

Страница 18: ...s higher than 15 Pa we recommend fitting a draught regulator in the flue This must not draw air from the installation room In order to guarantee optimum combustion the number of bends in the flue pipe...

Страница 19: ...close to the boiler as possible to ensure the temperature at which the device is operating at corresponds exactly to the boiler return temperature Boiler circuit pump should be set to a minimum flow...

Страница 20: ...11 Instructions Part Number IN1231 Ed 1 20 10 2 Hydraulic Diagrams 2 1 3 4 0 bar 2 1 3 4 0 bar 4 3 5 E S B E 2 0 6 0 4 0 8 0 1 0 0 C o 1 2 0 0 E S B E 2 0 6 0 4 0 8 0 1 0 0 C o 1 2 0 0 E S B E 2 0 6 0...

Страница 21: ...these parts during operation A warning sticker reiterating this is also located on the inside of the pellet filling cover Always keep the combustion chamber door closed even when cold When handling th...

Страница 22: ...ectly 5 Check Flue Tube Construction Check all joints in the flue system are sealed and air tight If using a draught stabiliser recommended set the draught stabiliser to the lowest possible negative p...

Страница 23: ...e pellet screw conveyor requesting the amount of fuel required for ignition with minimum smoking smoke maximum approx 10 30 seconds in combustion chamber the flame then establishes itself slowly 14 Ch...

Страница 24: ...O Menu I O Menu I O Menu I O Menu I O 02 Ignition time 1 XXX 03 Feed XXX 04 Ignition time 2 Flashing XXX adjust with 04 Ignition time 2 XXX 05 Number of ignition attempts XXX Parameters I O Daily ext...

Страница 25: ...lt detection Flashing XXX adjust with Menu I O 08 Flame temp fault detection XXX R1 PID_P Flashing XXX adjust with Menu I O R1 PID_P XXX Menu I O R3 PID_D Flashing XXX adjust with Menu I O R3 PID_D XX...

Страница 26: ...enu Operating mode Setup Info Suction Conveying System 80 in sub menu I O BUTTON pressed for 5 sec Sub menu Basic menu ON OFF BASIC MENU Menu I O Boiler Mode Temperatures Heating Stage Operation Appli...

Страница 27: ...illing chamber door All screws tight switch point door contact switch OK Filling chamber door Checked for tightness paper strip test Ash door All screws tight particularly the high screws at the botto...

Страница 28: ...e at the container must be pushed in to the stop and sealed with the insulation tape enclosed Filled recorder in the pellet supply container Remove a few handfuls of pellets and place them in a cardbo...

Страница 29: ...BUTORS H B S LTD July 2011 Instructions Part Number IN1231 Ed 1 29 Main function with buffer management Main function without buffer management External requirement ON OFF External requirement ON OFF...

Страница 30: ...d is certified periodically by an accredited authorised test institution The boiler models comply with the legal requirements and relevant standards for marketing according to Art 15a BVG on the basis...

Страница 31: ...EUROHEAT DISTRIBUTORS H B S LTD July 2011 Instructions Part Number IN1231 Ed 1 31...

Страница 32: ...491112 Technical 01885 491117 Reception 01885 491100 Need more info With over 10 000 pages of technical information spare parts product shots news and 1001 other things you will not find a more compr...

Отзывы: