EUROFOLD KIT LIST
PLEASE NOTE
Only to be used on flat surfaces unless equiped with adjustable legs.
If temporary platforms are used during assembly, reposition them during dismantling.
MOVING A TOWER
Remove people and materials from the tower, and lower the tower to 4m if all 4
stabilisers are in place. If not then reduce tower height to 2m. Adjust and raise the stabilizers 25mm from the
ground, ensure the couplers are tight, and push from at or near the base by manual effort only, never use
mechanical means. Recheck level and reposition stabilisers before use.
PPE REQUIRED:
Hard Hat, Safety Gloves, Safety Boots/Shoes, Hi-Viz Vest/Jacket
TOOLS REQUIRED:
Spirit Level
STABILISERS
Stabilisers increase the effective base dimensions
and imrpove the stability of the tower. Position the
stabilisers symmetrically to obtain the maximum
base dimension.
Maximum distance
between platforms
shall not exceed
2.25m.
Except the
distance to the
first platform max
3.40m
Do not bridge
between towers.
Maximum inclination
for
movement
. Note
the maximum angle
allowed is defined by
the manufacturer
Do not build, dismantle
or attempt to work on
an access tower if the
wind speed
exceeds 17MPH
Maximum inclination
for movement. Note
the maximum angle
allowed is defined by
the manufacturer
Do not stand on an
unguarded platform
Do not lift the
tower with mechanical
equipment
Do not use the tower
for access and egress
to other structures
Do not suspend the
tower
Do not lift heavy ob
-
jects from the tower
Do not move the
tower with people or
materials on it
Do not use ladders,-
boxes or other objects
to gain extra height
Do not climb the outside of the tower