![EUCHNER MGB2-BP Series Скачать руководство пользователя страница 20](http://html.mh-extra.com/html/euchner/mgb2-bp-series/mgb2-bp-series_operating-instructions-manual_2434739020.webp)
Operating Instructions Safety Systems
MGB2-L1…-BR.-… / MGB2-L2…-BR.-… and MGB2-L1…-BP.-… / MGB2-L2…-BP.-…
20
(Translation of the original operating instructions) 2500233-01-05/19
9. Mounting
WARNING
Mounting must be performed only by authorized personnel.
With two-leaf hinged doors, one of the two door leaves must also be latched mechanically.
Use a rod latch (Item) or a double-door lock (Bosch Rexroth) for this purpose, for example.
Important!
Ì
If installed flush, the switching distance changes as a function of the installation depth and the
guard material.
Locking
module
Handle module
Locking
module
Handle module
Surface mounting
Flush installation
Operating distance
Operating distance
Tip!
Ì
You will find an animation on the mounting process at www.euchner.com.
Ì
The pushbuttons and indicators can be customized using replaceable color covers and labels.
For mounting steps , see Figure 9 and Figure 12 to Figure 17.
Attach system such that operation of the auxiliary release as well as inspection and maintenance are possible.
The locking screw must be screwed back in and sealed after assembly and after every use of the auxiliary release. (Seal
labels order no. 155853). Tightening torque 0.5 Nm.